Laserfiche WebLink
Key Conclusions from Traffic Analysis <br />► Analysis of the No Bul/dOption indicates a need <br />to extend MnPASS lanes north of Little Canada <br />Road <br />► Each of the concepts considered show <br />northbound operational issues if built only to <br />CR 96 <br />► A Hybrid Option could produce a better return <br />on investment for the corridor then any of the <br />three concepts considered <br />