Laserfiche WebLink
MnPASS System <br />► MnPASS lanes under <br />construction on I-3 5 E north of <br />St. Paul - opening in Nov. 201 5 <br />► Four MnPASS expansion <br />projects in current 10 -yr. plan <br />- 35E Ext. (north of Ltl. Can.) 2016 <br />- 35W Ext. (46th -26th in Mpls.) 201 7 <br />- 94 (Mpls.-St. Paul) 2019-20 <br />- 35W (Roseville -Blaine) 2020-21 <br />► Other MnPASS corridors <br />- 35W (Mpls.-Roseville) <br />- TH 77 (NB lane App. Vall.-Blm.) <br />- TH 36 (EB lane 35W -35E) <br />- 35 Ext. (35W/35E-CR 70 Lakeville) <br />- 169 (Shakopee north) <br />- 494/94 <br />Regional 2030 Transportation Policy Plan <br />Future Managed Lane System <br />Sent_ 7f1.7011 <br />Existing MnPASS <br />35E MnPASS Construction <br />2013-2015 <br />Future Managed Lane <br />or MnPASS System <br />