My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-01-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
12-01-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 3:53:17 PM
Creation date
12/2/2014 3:17:53 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/01/2014
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 26, 2014 <br />Re: 2015 Street Reconstruction Project — Shenandoah Area <br />To Whom It May Concern: <br />After the recent election passed the project financing, the City of Lino Lakes will begin the Shenandoah <br />Neighborhood roadway reconstruction. WSB & Associates, Inc., engineering consultant for the City, will complete <br />the project design and construction observation. The project will include reconstructing the roadways, associated <br />surface water management facilities, and maintenance of the existing sanitary sewer. These improvements will <br />not be assessed. Our goal throughout the project is to provide a high-level of communication and public <br />engagement. <br />The City is holding a kick off neighborhood meeting at Lino Lakes City Hall Council Chamber at 7:00 p.m. on <br />December 16, 2014. At the meeting, we will share preliminary project details, our communication plan, and the <br />anticipated project schedule. We would like you to be aware of a few items as we start the project: <br />• In the coming weeks, you may see people in the neighborhood <br />collecting data for design of the proposed improvements. <br />• Currently, there is no municipal water extension proposed as part of this project. If the neighborhood is <br />interested, they will need to petition the City as outlined in the City's Charter. Water main improvements, if <br />requested, would be assessed. Additional information can be provided at the meeting. <br />• The project is planned to occur during the 2015 construction season. <br />• A project website will be established to enhance communication with the neighborhood <br />We look forward to working together to minimize construction impacts and complete a successful project! If you <br />know of any person from the neighborhood who did not receive this letter, please have them contact Brad or Diane <br />at the phone numbers or email addresses listed below. <br />Sincerely, <br />Diane Hankee, PE <br />City Engineer/WSB & Associates, Inc. <br />dhankee@wsbeng.com <br />651.286.8479 <br />4tosi‘Je?A4b,lre*•e <br />Brad Reifsteck, PE <br />Project Manager/WSB & Associates, Inc. <br />breifsteck@wsbeng.com <br />612.214.7053 <br />600 Town Center Parkway — Lino Lakes, MN 55014-1189 <br />City Hall: 651-982-2400 — www.ci.lino-lakes.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.