My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-01-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
12-01-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 3:53:17 PM
Creation date
12/2/2014 3:17:53 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/01/2014
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I -35E MnPASS Extension Study <br />► Study is - <br />• A process for helping determine whether there is a <br />feasible, viable option for extending MnPASS lanes <br />between Little Canada Rd. and CR 96 in 2016 when a <br />construction and funding opportunity exists <br />► Study is not - <br />• The federally required environmental (NEPA) process <br />• A process for determining whether MnPASS should be <br />implemented in the I-3 5 E corridor <br />• 2030 Transportation Policy Plan designated I -35E north of St. <br />Paul as a MnPASS Managed Lane corridor <br />• MnPASS lanes on I -35E between Cayuga St. and Little Canada <br />Rd. are under construction and due to open by Nov. 201 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.