Laserfiche WebLink
TKDA <br />*ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />1500 Piper Jaffrey Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292-4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />To: James Studenski, City Engineer Reference: Molin Concrete Products Company <br />Copies To: <br />From: Scott A. Brink 64-6 j ,q <br />Date: May 6, 2003 / <br />City of Lino Lakes, Minnesota <br />Comm. No. 12701 -002 <br />Routing:. <br />The proposed plans provide for building additions to the exist Molin Concrete Products Facility located at <br />the intersection of Lilac Street and Fourth Avenue. The additions consist of a restroom addition <br />(approximately 1000 sq. ft.) to the existing building (75,000 sq. ft.) and a maintenance garage addition <br />(approximately 3200 sq. ft.) to the existing office garage. <br />A set of Architectural and Structural plans have been submitted to the City of Lino Lakes, along with a site <br />utility plan. The following review comments are based upon Sheet Cl (utility plan) prepared by Plowe <br />i Engineering, Inc., dated March 14, 2003. <br />Comments <br />1. The project site is located at the northeast comer of the intersection of Lilac Street and Fourth <br />Avenue. The proposed building additions and associated utility work all occur on private property <br />and connect to existing private utility lines. The private lines serving the proposed additions are <br />8 -inch diameter sanitary sewer and 8 -inch diameter watermains, all adequate in size to accommodate <br />the proposed additions. However, the Contractor shall coordinate all proposed utility connections in <br />accordance with the City of Lino Lakes' requirements for building permits and associated utility <br />connections. <br />The Contractor shall adhere to working hours for construction activities in accordance with the <br />requirements of the City of Lino Lakes. <br />The Contractor shall provide a sweeper to clean streets and paved areas outside of the project site on <br />a daily basis as needed. <br />The Contractor shall install silt fence and erosion control measures around all disturbed areas. <br />A note must be added that the City of Lino Lakes Utility Supt. shall be contacted at least 48 hours <br />prior to any utility work, utility connections, or any work in the public right -of -way is performed. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />