Laserfiche WebLink
TABULATION OF BIDS <br />CELM STREET RECONSTRUCTION <br />CITY OF LINO LAKES <br />COMMISSION NO. 12390-03 <br />BIDS OPENED: JUNE 3, 2003, AT 10 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />MN/DOT ENGINEER'S ESTIMATE F.M. FRATTALONE <br />ITEM SPEC. UNIT TOTAL UNIT TOTAL <br />NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />TKDA <br />E NGFEERS • ARCHITECIS • PLANNERS <br />ARCON CONSTRUCTION <br />UNIT TOTAL <br />PRICE AMOUNT <br />ELM STREET RECONSTRUCTION <br />1 <br />2021.501 <br />MOBILIZATION <br />1 <br />LS <br />$ 50,000.00 <br />$ 50,000.00 <br />$ 89,700.00 <br />$ 89,700.00 <br />$ 7,500.00 <br />$ 75,000.00 <br />2 <br />2101.502 <br />CLEARING <br />139 <br />TR <br />$ 150.00 <br />$ 20,850.00 <br />$ 100.00 <br />$ 13,900.00 <br />$ 100.00 <br />$ 13,900.00 <br />3 <br />2101.507 <br />GRUBBING <br />139 <br />TR <br />$ 150.00 <br />$ 20,850.00 <br />$ 35.00 <br />$ 4,865.00 <br />$ 75.00 <br />$ 10,425.00 <br />4 <br />2104.501 <br />REMOVE PIPE (CULVERT OR STORM SEWER) <br />798 <br />LF <br />$ 14.00 <br />$ 11,172.00 <br />$ 8.00 <br />$ 6,384.00 <br />$ 9.60 <br />$ 7,660.80 <br />5 <br />2104.501 <br />REMOVE CURB & GUTTER <br />280 <br />LF <br />$ 4.00 <br />$ 1,120.00 <br />$ 2.50 <br />$ 700.00 <br />$ 1.50 <br />$ 420.00 <br />6 <br />2104.501 <br />REMOVE FENCE <br />154 <br />LF <br />$ 5.00 <br />$ 770.00 <br />$ 6.00 <br />$ 924.00 <br />$ 3.00 <br />$ 462.00 <br />7 <br />2104.501 <br />REMOVE WATERMAIN <br />106 <br />LF <br />$ 10.00 <br />$ 1,060.00 <br />$ 10.00 <br />$ 1,060.00 <br />$ 9.60 <br />$ 1,017.60 <br />8 <br />2104.503 <br />REMOVE CONCRETE PAVEMENT <br />1544 <br />SF <br />$ 2.00 <br />$ 3,088.00 <br />$ 0.50 <br />$ 772.00 <br />$ 0.50 <br />$ 772.00 <br />9 <br />2104.505 <br />REMOVE BITUMINOUS SURFACING <br />20816 <br />SY <br />$ 1.80 <br />$ 37,468.80 <br />$ 1.55 <br />$ 32,264.80 <br />$ 1.00 <br />$ 20,816.00 <br />10 <br />2104.509 <br />REMOVE MANHOLE OR CATCH BASIN <br />4 <br />EA <br />$ 400.00 <br />$ 1,600.00 <br />$ 300.00 <br />$ 1,200.00 <br />$ 300.00 <br />$ 1,200.00 <br />11 <br />2104.509 <br />REMOVE CONCRETE APRON <br />19 <br />EA <br />$ 200.00 <br />$ 3,800.00 <br />$ 100.00 <br />$ 1,900.00 <br />$ 60.00 <br />$ 1,140.00 <br />12 <br />2104.511 <br />SAWCUT CONCRETE PAVEMENT (FULL DEPTH) <br />150 <br />LF <br />$ 5.00 <br />$ 750.00 <br />$ 7.00 <br />$ 1,050.00 <br />$ 5.00 <br />$ 750.00 <br />13 <br />2104.513 <br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />950 <br />LF <br />$ 3.00 <br />$ 2,850.00 <br />$ 2.00 <br />$ 1,900.00 <br />$ 3.00 <br />$ 2,850.00 <br />14 <br />2104.521 <br />SALVAGE FENCE <br />50 <br />LF <br />$ 8.00 <br />$ 400.00 <br />$ 25.00 <br />$ 1,250.00 <br />$ 25.00 <br />$ 1,250.00 <br />15 <br />2104.523 <br />SALVAGE MAIL BOX SUPPORT <br />37 <br />EA <br />$ 50.00 <br />$ 1,850.00 <br />$ 85.00 <br />$ 3,145.00 <br />$ 85.00 <br />$ 3,145.00 <br />16 <br />2104.523 <br />SALVAGE SIGN (INCL. POST & ASSEMBLY) <br />20 <br />EA <br />$ 30.00 <br />$ 600.00 <br />$ 25.00 <br />$ 500.00 <br />$ 25.00 <br />$ 500.00 <br />17 <br />2104.523 <br />SALVAGE HYDRANT <br />4 <br />EA <br />$ 300.00 <br />$ 1,200.00 <br />$ 600.00 <br />$ 2,400.00 <br />$ 180.00 <br />$ 720.00 <br />18 <br />2104.523 <br />SALVAGE GATE VALVE & BOX <br />5 <br />EA <br />$ 200.00 <br />$ 1,000.00 <br />$ 75.00 <br />$ 375.00 <br />$ 90.00 <br />$ 450.00 <br />19 <br />2105.501 <br />COMMON EXCAVATION (P) <br />19500 <br />CY <br />$ 7.00 <br />$ 136,500.00 <br />$ 9.15 <br />$ 178,425.00 <br />$ 5.78 <br />$ 112,710.00 <br />20 <br />2105.501 <br />POND EXCAVATION <br />9675 <br />CY <br />$ 7.00 <br />$ 67,725.00 <br />$ 5.25 <br />$ 50,793.75 <br />$ 4.92 <br />$ 47,601.00 <br />21 <br />2105.522 <br />SELECT GRANULAR BORROW (CV) (P) <br />7562 <br />CY <br />$ 12.00 <br />$ 90,744.00 <br />$ 10.65 <br />$ 80,535.30 <br />$ 9.18 <br />$ 69,419.16 <br />22 <br />2105.525 <br />TOPSOIL BORROW (LV) <br />453 <br />CY <br />$ 11.00 <br />$ 4,983.00 <br />$ 10.00 <br />$ 4,530.00 <br />$ 7.80 <br />$ 3,533.40 <br />23 <br />2105.603 <br />CRUSHED ROCK 6' DEPTH (TRENCH STABILIZING) <br />3151 <br />LF <br />$ 1.70 <br />$ 5,356.70 <br />$ 225 <br />$ 7,089.75 <br />$ 0.01 <br />$ 31.51 <br />24 <br />2123.610 <br />EXPLORATORY DIGGING <br />20 <br />HR <br />$ 200.00 <br />$ 4,000.00 <br />$ 139.00 <br />$ 2,780.00 <br />$ 450.00 <br />$ 9,000.00 <br />25 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />12000 <br />TN <br />$ 10.00 <br />$ 120,000.00 <br />$ 6.80 <br />$ 81,600.00 <br />$ 10.14 <br />$ 121,680.00 <br />26 <br />2350.501 <br />TYPE LV AGG. 3 WEARING COURSE (B) <br />2025 <br />TN <br />$ 36.00 <br />$ 72,900.00 <br />$ 31.65 <br />$ 64,09125 <br />$ 30.50 <br />$ 61,762.50 <br />27 <br />2350.501 <br />TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B) <br />550 <br />TN <br />$ 36.00 <br />$ 19,800.00 <br />$ 39.05. <br />$ 21,477.50 <br />$ 44.65 <br />$ 24,557.50 <br />28 <br />2350.502 <br />TYPE LV AGG. 3 NON - WEARING COURSE (B) <br />2025 <br />TN <br />$ 35.00 <br />$ 70,875.00 <br />$ 31.65 <br />$ 64,09125 <br />$ 29.60 <br />$ 59,940.00 <br />29 <br />2350.503 <br />TYPE LV AGG. 4 WEARING COURSE 2' THICK FOR DRIVEWAYS <br />(B) <br />1500 <br />SY <br />$ 10.00 <br />$ 15,000.00 <br />$ 10.00 <br />$ 15,000.00 <br />$ 8.50 <br />$ 12,750.00 <br />30 <br />2357.502 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />880 <br />GAL <br />$ 2.50 <br />$ 2,200.00 <br />$ 2.50 <br />$ 2,200.00 <br />$ 1.35 <br />$ 1,188.00 <br />31 <br />2501.515 <br />15' RC PIPE APRON W/ TRASH GUARD <br />6 <br />EA <br />$ 700.00 <br />$ 4,200.00 <br />$ 625.00 <br />$ 3,750.00 <br />$ 659.00 <br />$ 3,954.00 <br />32 <br />2501.515 <br />21" RC PIPE APRON W/ TRASH GUARD <br />2 <br />EA <br />$ 800.00 <br />$ 1,600.00 <br />$ 825.00 <br />$ 1,650.00 <br />$ 930.00 <br />$ 1,860.00 <br />33 <br />2502.541 <br />4" PERF PE PIPE DRAIN (W/ SOCK) <br />512 <br />LF <br />$ 6.00 <br />$ 3,072.00 <br />$ 6.00 <br />$ 3,072.00 <br />$ 9.00 <br />$ 4,608.00 <br />34 <br />2503.541 <br />15" RC PIPE SEWER CLASS V DESIGN 3006 <br />2733 <br />LF <br />$ 26.00 <br />$ 71,058.00 <br />$ 21.75 <br />$ 59,442.75 <br />$ 2426 <br />$ 66,302.58 <br />35 <br />2503.541 <br />18" RC PIPE SEWER CLASS V DESIGN 3006 <br />830 <br />LF <br />$ 30.00 <br />$ 24,900.00 <br />$ 23.75 <br />$ 19,712.50 <br />$ 25.93 <br />$ 21,521.90 <br />36 <br />2503.541 <br />21' RC PIPE SEWER CLASS III DESIGN 3006 <br />902 <br />LF <br />$ 34.00 <br />$ 30,668.00 <br />$ 2625 <br />$ 23,677.50 <br />$ 2928 <br />$ 26,410.56 <br />37 <br />2503.602 <br />CONNECT TO EXISTING MANHOLES (SANITARY SEWER) <br />1 <br />EA <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />$ 2,100.00 <br />$ 2,100.00 <br />38 <br />2503.602 <br />8 "X4` PVC WYE (SCHEDULE 40) <br />30 <br />EA <br />$ 60.00 <br />$ 1,800.00 <br />$ 220.00 <br />$ 6,600.00 <br />$ 70.00 <br />$ 2,100.00 <br />39 <br />2503.603 <br />8" PVC, SDR 35 PIPE SEWER (10' -12' DEPTH) <br />69 <br />LF <br />$ 20.00 <br />$ 1,380.00 <br />$ 61.30 <br />$ 4,229.70 <br />$ 43.77 <br />$ 3,020.13 <br />40 <br />2503.603 <br />8" PVC, SDR 35 PIPE SEWER (12' -14' DEPTH) <br />620 <br />LF <br />$ 22.00 <br />$ 13,640.00 <br />$ 61.30 <br />$ 38,006.00 <br />$ 48.79 <br />$ 30,249.80 <br />41 <br />2503.603 <br />8' PVC, SDR 35 PIPE SEWER (14' -16' DEPTH) <br />430 <br />LF <br />$ 24.00 <br />$ 10,320.00 <br />$ 61.30 <br />$ 26,359.00 <br />$ 56.33 <br />$ 24,221.90 <br />42 <br />2503.603 <br />8" PVC, SDR 35 PIPE SEWER (16' -18' DEPTH) <br />626 <br />LF <br />$ 26.00 <br />$ 16,276.00 <br />$ 61.30 <br />$ 38,373.80 <br />$ 61.71 <br />$ 38,630.46 <br />Page 1 <br />