TABULATION OF BIDS
<br />CELM STREET RECONSTRUCTION
<br />CITY OF LINO LAKES
<br />COMMISSION NO. 12390-03
<br />BIDS OPENED: JUNE 3, 2003, AT 10 AM
<br />*DENOTES ERROR IN BIDDERS CALCULATION
<br />MN/DOT ENGINEER'S ESTIMATE F.M. FRATTALONE
<br />ITEM SPEC. UNIT TOTAL UNIT TOTAL
<br />NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT
<br />TKDA
<br />E NGFEERS • ARCHITECIS • PLANNERS
<br />ARCON CONSTRUCTION
<br />UNIT TOTAL
<br />PRICE AMOUNT
<br />ELM STREET RECONSTRUCTION
<br />1
<br />2021.501
<br />MOBILIZATION
<br />1
<br />LS
<br />$ 50,000.00
<br />$ 50,000.00
<br />$ 89,700.00
<br />$ 89,700.00
<br />$ 7,500.00
<br />$ 75,000.00
<br />2
<br />2101.502
<br />CLEARING
<br />139
<br />TR
<br />$ 150.00
<br />$ 20,850.00
<br />$ 100.00
<br />$ 13,900.00
<br />$ 100.00
<br />$ 13,900.00
<br />3
<br />2101.507
<br />GRUBBING
<br />139
<br />TR
<br />$ 150.00
<br />$ 20,850.00
<br />$ 35.00
<br />$ 4,865.00
<br />$ 75.00
<br />$ 10,425.00
<br />4
<br />2104.501
<br />REMOVE PIPE (CULVERT OR STORM SEWER)
<br />798
<br />LF
<br />$ 14.00
<br />$ 11,172.00
<br />$ 8.00
<br />$ 6,384.00
<br />$ 9.60
<br />$ 7,660.80
<br />5
<br />2104.501
<br />REMOVE CURB & GUTTER
<br />280
<br />LF
<br />$ 4.00
<br />$ 1,120.00
<br />$ 2.50
<br />$ 700.00
<br />$ 1.50
<br />$ 420.00
<br />6
<br />2104.501
<br />REMOVE FENCE
<br />154
<br />LF
<br />$ 5.00
<br />$ 770.00
<br />$ 6.00
<br />$ 924.00
<br />$ 3.00
<br />$ 462.00
<br />7
<br />2104.501
<br />REMOVE WATERMAIN
<br />106
<br />LF
<br />$ 10.00
<br />$ 1,060.00
<br />$ 10.00
<br />$ 1,060.00
<br />$ 9.60
<br />$ 1,017.60
<br />8
<br />2104.503
<br />REMOVE CONCRETE PAVEMENT
<br />1544
<br />SF
<br />$ 2.00
<br />$ 3,088.00
<br />$ 0.50
<br />$ 772.00
<br />$ 0.50
<br />$ 772.00
<br />9
<br />2104.505
<br />REMOVE BITUMINOUS SURFACING
<br />20816
<br />SY
<br />$ 1.80
<br />$ 37,468.80
<br />$ 1.55
<br />$ 32,264.80
<br />$ 1.00
<br />$ 20,816.00
<br />10
<br />2104.509
<br />REMOVE MANHOLE OR CATCH BASIN
<br />4
<br />EA
<br />$ 400.00
<br />$ 1,600.00
<br />$ 300.00
<br />$ 1,200.00
<br />$ 300.00
<br />$ 1,200.00
<br />11
<br />2104.509
<br />REMOVE CONCRETE APRON
<br />19
<br />EA
<br />$ 200.00
<br />$ 3,800.00
<br />$ 100.00
<br />$ 1,900.00
<br />$ 60.00
<br />$ 1,140.00
<br />12
<br />2104.511
<br />SAWCUT CONCRETE PAVEMENT (FULL DEPTH)
<br />150
<br />LF
<br />$ 5.00
<br />$ 750.00
<br />$ 7.00
<br />$ 1,050.00
<br />$ 5.00
<br />$ 750.00
<br />13
<br />2104.513
<br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH)
<br />950
<br />LF
<br />$ 3.00
<br />$ 2,850.00
<br />$ 2.00
<br />$ 1,900.00
<br />$ 3.00
<br />$ 2,850.00
<br />14
<br />2104.521
<br />SALVAGE FENCE
<br />50
<br />LF
<br />$ 8.00
<br />$ 400.00
<br />$ 25.00
<br />$ 1,250.00
<br />$ 25.00
<br />$ 1,250.00
<br />15
<br />2104.523
<br />SALVAGE MAIL BOX SUPPORT
<br />37
<br />EA
<br />$ 50.00
<br />$ 1,850.00
<br />$ 85.00
<br />$ 3,145.00
<br />$ 85.00
<br />$ 3,145.00
<br />16
<br />2104.523
<br />SALVAGE SIGN (INCL. POST & ASSEMBLY)
<br />20
<br />EA
<br />$ 30.00
<br />$ 600.00
<br />$ 25.00
<br />$ 500.00
<br />$ 25.00
<br />$ 500.00
<br />17
<br />2104.523
<br />SALVAGE HYDRANT
<br />4
<br />EA
<br />$ 300.00
<br />$ 1,200.00
<br />$ 600.00
<br />$ 2,400.00
<br />$ 180.00
<br />$ 720.00
<br />18
<br />2104.523
<br />SALVAGE GATE VALVE & BOX
<br />5
<br />EA
<br />$ 200.00
<br />$ 1,000.00
<br />$ 75.00
<br />$ 375.00
<br />$ 90.00
<br />$ 450.00
<br />19
<br />2105.501
<br />COMMON EXCAVATION (P)
<br />19500
<br />CY
<br />$ 7.00
<br />$ 136,500.00
<br />$ 9.15
<br />$ 178,425.00
<br />$ 5.78
<br />$ 112,710.00
<br />20
<br />2105.501
<br />POND EXCAVATION
<br />9675
<br />CY
<br />$ 7.00
<br />$ 67,725.00
<br />$ 5.25
<br />$ 50,793.75
<br />$ 4.92
<br />$ 47,601.00
<br />21
<br />2105.522
<br />SELECT GRANULAR BORROW (CV) (P)
<br />7562
<br />CY
<br />$ 12.00
<br />$ 90,744.00
<br />$ 10.65
<br />$ 80,535.30
<br />$ 9.18
<br />$ 69,419.16
<br />22
<br />2105.525
<br />TOPSOIL BORROW (LV)
<br />453
<br />CY
<br />$ 11.00
<br />$ 4,983.00
<br />$ 10.00
<br />$ 4,530.00
<br />$ 7.80
<br />$ 3,533.40
<br />23
<br />2105.603
<br />CRUSHED ROCK 6' DEPTH (TRENCH STABILIZING)
<br />3151
<br />LF
<br />$ 1.70
<br />$ 5,356.70
<br />$ 225
<br />$ 7,089.75
<br />$ 0.01
<br />$ 31.51
<br />24
<br />2123.610
<br />EXPLORATORY DIGGING
<br />20
<br />HR
<br />$ 200.00
<br />$ 4,000.00
<br />$ 139.00
<br />$ 2,780.00
<br />$ 450.00
<br />$ 9,000.00
<br />25
<br />2211.501
<br />AGGREGATE BASE CLASS 5
<br />12000
<br />TN
<br />$ 10.00
<br />$ 120,000.00
<br />$ 6.80
<br />$ 81,600.00
<br />$ 10.14
<br />$ 121,680.00
<br />26
<br />2350.501
<br />TYPE LV AGG. 3 WEARING COURSE (B)
<br />2025
<br />TN
<br />$ 36.00
<br />$ 72,900.00
<br />$ 31.65
<br />$ 64,09125
<br />$ 30.50
<br />$ 61,762.50
<br />27
<br />2350.501
<br />TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B)
<br />550
<br />TN
<br />$ 36.00
<br />$ 19,800.00
<br />$ 39.05.
<br />$ 21,477.50
<br />$ 44.65
<br />$ 24,557.50
<br />28
<br />2350.502
<br />TYPE LV AGG. 3 NON - WEARING COURSE (B)
<br />2025
<br />TN
<br />$ 35.00
<br />$ 70,875.00
<br />$ 31.65
<br />$ 64,09125
<br />$ 29.60
<br />$ 59,940.00
<br />29
<br />2350.503
<br />TYPE LV AGG. 4 WEARING COURSE 2' THICK FOR DRIVEWAYS
<br />(B)
<br />1500
<br />SY
<br />$ 10.00
<br />$ 15,000.00
<br />$ 10.00
<br />$ 15,000.00
<br />$ 8.50
<br />$ 12,750.00
<br />30
<br />2357.502
<br />BITUMINOUS MATERIAL FOR TACK COAT
<br />880
<br />GAL
<br />$ 2.50
<br />$ 2,200.00
<br />$ 2.50
<br />$ 2,200.00
<br />$ 1.35
<br />$ 1,188.00
<br />31
<br />2501.515
<br />15' RC PIPE APRON W/ TRASH GUARD
<br />6
<br />EA
<br />$ 700.00
<br />$ 4,200.00
<br />$ 625.00
<br />$ 3,750.00
<br />$ 659.00
<br />$ 3,954.00
<br />32
<br />2501.515
<br />21" RC PIPE APRON W/ TRASH GUARD
<br />2
<br />EA
<br />$ 800.00
<br />$ 1,600.00
<br />$ 825.00
<br />$ 1,650.00
<br />$ 930.00
<br />$ 1,860.00
<br />33
<br />2502.541
<br />4" PERF PE PIPE DRAIN (W/ SOCK)
<br />512
<br />LF
<br />$ 6.00
<br />$ 3,072.00
<br />$ 6.00
<br />$ 3,072.00
<br />$ 9.00
<br />$ 4,608.00
<br />34
<br />2503.541
<br />15" RC PIPE SEWER CLASS V DESIGN 3006
<br />2733
<br />LF
<br />$ 26.00
<br />$ 71,058.00
<br />$ 21.75
<br />$ 59,442.75
<br />$ 2426
<br />$ 66,302.58
<br />35
<br />2503.541
<br />18" RC PIPE SEWER CLASS V DESIGN 3006
<br />830
<br />LF
<br />$ 30.00
<br />$ 24,900.00
<br />$ 23.75
<br />$ 19,712.50
<br />$ 25.93
<br />$ 21,521.90
<br />36
<br />2503.541
<br />21' RC PIPE SEWER CLASS III DESIGN 3006
<br />902
<br />LF
<br />$ 34.00
<br />$ 30,668.00
<br />$ 2625
<br />$ 23,677.50
<br />$ 2928
<br />$ 26,410.56
<br />37
<br />2503.602
<br />CONNECT TO EXISTING MANHOLES (SANITARY SEWER)
<br />1
<br />EA
<br />$ 3,000.00
<br />$ 3,000.00
<br />$ 4,000.00
<br />$ 4,000.00
<br />$ 2,100.00
<br />$ 2,100.00
<br />38
<br />2503.602
<br />8 "X4` PVC WYE (SCHEDULE 40)
<br />30
<br />EA
<br />$ 60.00
<br />$ 1,800.00
<br />$ 220.00
<br />$ 6,600.00
<br />$ 70.00
<br />$ 2,100.00
<br />39
<br />2503.603
<br />8" PVC, SDR 35 PIPE SEWER (10' -12' DEPTH)
<br />69
<br />LF
<br />$ 20.00
<br />$ 1,380.00
<br />$ 61.30
<br />$ 4,229.70
<br />$ 43.77
<br />$ 3,020.13
<br />40
<br />2503.603
<br />8" PVC, SDR 35 PIPE SEWER (12' -14' DEPTH)
<br />620
<br />LF
<br />$ 22.00
<br />$ 13,640.00
<br />$ 61.30
<br />$ 38,006.00
<br />$ 48.79
<br />$ 30,249.80
<br />41
<br />2503.603
<br />8' PVC, SDR 35 PIPE SEWER (14' -16' DEPTH)
<br />430
<br />LF
<br />$ 24.00
<br />$ 10,320.00
<br />$ 61.30
<br />$ 26,359.00
<br />$ 56.33
<br />$ 24,221.90
<br />42
<br />2503.603
<br />8" PVC, SDR 35 PIPE SEWER (16' -18' DEPTH)
<br />626
<br />LF
<br />$ 26.00
<br />$ 16,276.00
<br />$ 61.30
<br />$ 38,373.80
<br />$ 61.71
<br />$ 38,630.46
<br />Page 1
<br />
|