Laserfiche WebLink
TABULATION OF BIDS <br />ELM STREET RECONSTRUCTION <br />CITY OF LINO LAKES <br />COMMISSION NO. 12390 -03 <br />BIDS OPENED: JUNE 3, 2003, AT 10 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />MN/DOT BARBAROSSA & SONS NORTHDALE CONSTRUCTION <br />ITEM SPEC. UNIT TOTAL UNIT TOTAL <br />NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />niKDA <br />1 <br />ENGINEERS • ARCHRECTS• PLANNERS <br />FRIEDGES CONTRACTING <br />UNIT TOTAL <br />PRICE AMOUNT <br />ELM STREET RECONSTRUCTION <br />1 <br />2021.501 <br />MOBILIZATION <br />1 <br />LS <br />$ 67,000.00 <br />$ 67,000.00 <br />$ 91,345.00 <br />$ 91,345.00 <br />$ 75,397.78 <br />$ 75,397.78 <br />2 <br />2101.502 <br />CLEARING <br />139 <br />TR <br />$ 55.00 <br />$ 7,645.00 <br />$ 250.00 <br />$ 34,750.00 <br />$ 264.19 <br />$ 36,722.41 <br />3 <br />2101.507 <br />GRUBBING <br />139 <br />TR <br />$ 50.00 <br />$ 6,950.00 <br />$ 150.00 <br />$ 20,850.00 <br />$ 264.19 <br />$ 36,722.41 <br />4 <br />2104.501 <br />REMOVE PIPE (CULVERT OR STORM SEWER) <br />798 <br />LF <br />$ 10.00 <br />$ 7,980.00 <br />$ 10.00 <br />$ 7,980.00 <br />$ 11.60 <br />$ 9,256.80 <br />5 <br />2104.501 <br />REMOVE CURB & GUTTER <br />280 <br />LF <br />$ 2.00 <br />$ 560.00 <br />$ 1.61 <br />$ 450.80 <br />$ 330 <br />$ 924.00 <br />6 <br />2104.501 <br />REMOVE FENCE <br />154 <br />LF <br />$ 10.00 <br />$ 1,540.00 <br />$ 10.00 <br />$ 1,540.00 <br />$ 5.67 <br />$ 873.18 <br />7 <br />2104.501 <br />REMOVE WATERMAIN <br />106 <br />LF <br />$ 10.00 <br />$ 1,060.00 <br />$ 10.00 <br />$ 1,060.00 <br />$ 10.77 <br />$ 1,141.62 <br />8 <br />2104.503 <br />REMOVE CONCRETE PAVEMENT <br />1544 <br />SF <br />$ 0.60 <br />$ 926.40 <br />$ 1.00 <br />$ 1,544.00 <br />$ 2.51 <br />$ 3,875.44 <br />9 <br />2104.505 <br />REMOVE BITUMINOUS SURFACING <br />20816 <br />SY <br />$ 130 <br />$ 27,060.80 <br />$ 2.00 <br />$ 41,632.00 <br />$ 2.24 <br />$ 46,627.84 <br />10 <br />2104.509 <br />REMOVE MANHOLE OR CATCH BASIN <br />4 <br />EA <br />$ 300.00 <br />$ 1,200.00 <br />$ 500.00 <br />$ 2,000.00 <br />$ 472.30 <br />$ 1,889.20 <br />11 <br />2104.509 <br />REMOVE CONCRETE APRON <br />19 <br />EA <br />$ 300.00 <br />$ 5,700.00 <br />$ 100.00 <br />$ 1,900.00 <br />$ 216.41 <br />$ 4,111.79 <br />12 <br />2104.511 <br />SAWCUT CONCRETE PAVEMENT (FULL DEPTH) <br />150 <br />LF <br />$ 5.00 <br />$ 750.00 <br />$ 6.00 <br />$ 900.00 <br />$ 5.14 <br />$ 771.00 <br />13 <br />2104.513 <br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />950 <br />LF <br />$ 3.00 <br />$ 2,850.00 <br />$ 4.00 <br />$ 3,800.00 <br />$ 3.56 <br />$ 3,382.00 <br />14 <br />2104.521 <br />SALVAGE FENCE <br />50 <br />LF <br />$ 25.00 <br />$ 1,250.00 <br />$ 26.88 <br />$ 1,344.00 <br />$ 27.25 <br />$ 1,362.50 <br />15 <br />2104.523 <br />SALVAGE MAIL BOX SUPPORT <br />37 <br />EA <br />$ 30.00 <br />$ 1,110.00 <br />$ 91.38 <br />$ 3,381.06 <br />$ 32.52 <br />$ 1,203.24 <br />16 <br />2104.523 <br />SALVAGE SIGN (INCL. POST & ASSEMBLY) <br />20 <br />EA <br />$ 20.00 <br />$ 400.00 <br />$ 26.88 <br />$ 537.60 <br />$ 21.99 <br />$ 439.80 <br />17 <br />2104.523 <br />SALVAGE HYDRANT ' <br />4 <br />EA <br />$ 300.00 <br />$ 1,200.00 <br />$ 500.00 <br />$ 2,000.00 <br />$ 1,886.44 <br />$ 7,545.76 <br />18 <br />2104.523 <br />SALVAGE GATE VALVE & BOX <br />5 <br />EA <br />$ 50.00 <br />$ 250.00 <br />$ 500.00 <br />$ 2,500.00 <br />$ 151.77 <br />$ 758.85 <br />19 <br />2105.501 <br />COMMON EXCAVATION (P) <br />19500 <br />CY <br />$ 6.10 <br />$ 118,950.00 <br />$ 6.21 <br />$ 121,095.00 <br />$ 8.83 <br />$ 172,185.00 <br />20 <br />2105.501 <br />POND EXCAVATION <br />9675 <br />CY <br />$ 5.20 <br />$ 50,310.00 <br />$ 529 <br />$ 51,180.75 <br />$ 9.88 <br />$ 95,589.00 <br />21 <br />2105.522 <br />SELECT GRANULAR BORROW (CV) (P) <br />7562 <br />CY <br />$ 10.00 <br />$ 75,620.00 <br />$ 9.87 <br />$ 74,636.94 <br />$ 10.93 <br />$ 82,652.66 <br />22 <br />2105.525 <br />TOPSOIL BORROW (LV) <br />453 <br />CY <br />$ 8.00 <br />$ 3,624.00 <br />$ 8.39 <br />$ 3,800.67 <br />$ 9.35 <br />$ 4,235.55 <br />23 <br />2105.603 <br />CRUSHED ROCK 6' DEPTH (TRENCH STABILIZING) <br />3151 <br />LF <br />$ 2.50 <br />$ 7,877.50 <br />$ 3.00 <br />$ 9,453.00 <br />$ 7.09 <br />$ 22,340.59 <br />24 <br />2123.610 <br />EXPLORATORY DIGGING <br />20 <br />HR <br />$ 150.00 <br />$ 3,000.00 <br />$ 475.00 <br />$ 9,500.00 <br />$ 503.73 <br />$ 10,074.60 <br />25 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />12000 <br />TN <br />$ 11.00 <br />$ 132,000.00 <br />$ 10.90 <br />$ 130,800.00 <br />$ 12.51 <br />$ 150,120.00 <br />26 <br />2350.501 <br />TYPE LV AGG. 3 WEARING COURSE (B) <br />2025 <br />TN <br />$ 32.00 <br />$ 64,800.00 <br />$ 35.85 <br />$ 72,596.25 <br />$ 32.52 <br />$ 65,853.00 <br />27 <br />2350.501 <br />TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B) <br />550 <br />TN <br />$ 47.00 <br />$ 25,850.00 <br />$ 46.17 <br />$ 25,393.50 <br />$ 35.15 <br />$ 19,332.50 <br />28 <br />2350.502 <br />TYPE LV AGG. 3 NON - WEARING COURSE (B) <br />2025 <br />TN <br />$ 31.00 <br />$ 62,775.00 <br />$ 36.87 <br />$ 74,661.75 <br />$ 31.99 <br />$ 64,779.75 <br />29 <br />2350.503 <br />TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR DRIVEWAYS <br />(B) <br />1500 <br />SY <br />$ 10.00 <br />$ 15,000.00 <br />$ 10.54 <br />$ 15,810.00 <br />$ 7.25 <br />$ 10,875.00 <br />30 <br />2357.502 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />880 <br />GAL <br />$ 1.50 <br />$ 1,320.00 <br />$ 1.83 <br />$ 1,610.40 <br />$ 2.82 <br />$ 2,481.60 <br />31 <br />2501.515 <br />15' RC PIPE APRON W/ TRASH GUARD <br />6 <br />EA <br />$ 440.00 <br />$ 2,640.00 <br />$ 560.02 <br />$ 3,360.12 <br />$ 686.35 <br />$ 4,118.10 <br />32 <br />2501.515 <br />21" RC PIPE APRON W/ TRASH GUARD <br />2 <br />EA <br />$ 550.00 <br />$ 1,100.00 <br />$ 682.50 <br />$ 1,365.00 <br />$ 810.83 <br />$ 1,621.66 <br />33 <br />2502.541 <br />4" PERF PE PIPE DRAIN (W/ SOCK) <br />512 <br />LF <br />$ 10.00 <br />$ 5,120.00 <br />$ 7.97 <br />$ 4,080.64 <br />$ 16.07 <br />$ 8,227.84 <br />34 <br />2503.541 <br />15` RC PIPE SEWER CLASS V DESIGN 3006 <br />2733 <br />LF <br />$ 30.00 <br />$ 81,990.00 <br />$ 31.76 <br />$ 86,800.08 <br />$ 30.11 <br />$ 82,290.63 <br />35 <br />2503.541 <br />18' RC PIPE SEWER CLASS V DESIGN 3006 <br />830 <br />LF <br />$ 33.00 <br />$ 27,390.00 <br />$ 33.89 <br />$ 28,128.70 <br />$ 32.13 <br />$ 26,667.90 <br />36 <br />2503.541 <br />21' RC PIPE SEWER CLASS 111 DESIGN 3006 <br />902 <br />LF <br />$ 38.00 <br />$ 34,276.00 <br />$ 36.02 <br />$ 32,490.04 <br />$ 34.90 <br />$ 31,479.80 <br />37 <br />2503.602 <br />CONNECT TO EXISTING MANHOLES (SANITARY SEWER) <br />1 <br />EA <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 2,375.00 <br />$ 2,375.00 <br />$ 9,225.19 <br />$ 9,225.19 <br />38 <br />2503.602 <br />8 "X4' PVC WYE (SCHEDULE 40) <br />30 <br />EA <br />$ 100.00 <br />$ 3,000.00 <br />$ 181.95 <br />$ 5,458.50 <br />$ 39.01 <br />$ 1,170.30 <br />39 <br />2503.603 <br />8° PVC, SDR 35 PIPE SEWER (10' -12' DEPTH) <br />69 <br />LF <br />$ 77.00 <br />$ 5,313.00 <br />$ 54.13 <br />$ 3,734.97 <br />$ 23.02 <br />$ 1,588.38 <br />40 <br />2503.603 <br />8' PVC, SDR 35 PIPE SEWER (12' -14' DEPTH) <br />620 <br />LF <br />$ 77.00 <br />$ 47,740.00 <br />$ 58.65 <br />$ 36,363.00 <br />$ 24.12 <br />$ 14,954.40 <br />41 <br />2503.603 <br />8" PVC, SCR 35 PIPE SEWER (14' -16' DEPTH) <br />430 <br />LF <br />$ 77.00 <br />$ 33,110.00 <br />$ 64.99 <br />$ 27,945.70 <br />$ 29.18 <br />$ 12,547.40 <br />42 <br />2503.603 <br />8" PVC, SDR 35 PIPE SEWER (16' -18' DEPTH) <br />626 <br />LF <br />$ 77.00 <br />$ 48,202.00 <br />$ 74.49 <br />$ 46,630.74 <br />$ 35.65 <br />$ 22,316.90 <br />Page 4 <br />