TABULATION OF BIDS
<br />ELM STREET RECONSTRUCTION
<br />CITY OF LINO LAKES
<br />COMMISSION NO 12390 -03
<br />BIDS OPENED: JUNE 3, 2003, AT 10 AM
<br />'DENOTES ERROR IN BIDDERS CALCULATION
<br />MN/DOT BARBAROSSA & SONS NORTHDALE CONSTRUCTION
<br />ITEM SPEC. UNIT TOTAL UNIT TOTAL
<br />NO NO DESCRIPTION QUANTITY UNIT PRICE AMOUNT , PRICE AMOUNT
<br />��
<br />ENGINEERS • ARO-ITEMS • PLANNERS
<br />FRIEDGES CONTRACTING
<br />UNIT TOTAL
<br />PRICE AMOUNT
<br />80
<br />2511.501
<br />RANDOM RIPRAP CLASS III
<br />22
<br />CY
<br />$ 60.00
<br />$ 1,320.00
<br />$ 80.00
<br />$ 1,760.00
<br />$ 86.64
<br />$ 1,906.08
<br />81
<br />2531.501
<br />CONCRETE CURB AND GUTTER DESIGN B618
<br />10540
<br />LF
<br />$ 7.60
<br />$ 80,104.00
<br />$ 7.85
<br />$ 82,739.00
<br />$ 8.67
<br />$ 91,381.80
<br />82
<br />2531.507
<br />6" CONCRETE DRIVEWAY PAVEMENT
<br />155
<br />SY
<br />$ 33.00
<br />$ 5,115.00
<br />$ 36.86
<br />$ 5,713.30
<br />$ 39.71
<br />$ 6,155.05
<br />83
<br />2531.507
<br />8" CONCRETE DRIVEWAY PAVEMENT
<br />278
<br />SY
<br />$ 37.00
<br />$ 10,286.00
<br />$ 40.73
<br />$ 11,322.94
<br />$ 43.50
<br />$ 12,093.00
<br />84
<br />2540.602
<br />INSTALL MAIL BOX SUPPORT
<br />37
<br />EA
<br />$ 85.00
<br />$ 3,145.00
<br />$ 91.38
<br />$ 3,381.06
<br />$ 43.05
<br />$ 1,592.85
<br />85
<br />2540.602
<br />MAIL BOX SUPPORT
<br />5
<br />EA
<br />$ 130.00
<br />$ 650.00
<br />$ 134.38
<br />$ 671.90
<br />$ 58.84
<br />$ 294.20
<br />86
<br />2554.603
<br />SALVAGE & REINSTALL STEEL PLATE BEAM GUARDRAIL
<br />35
<br />LF
<br />$ 60.00
<br />$ 2,100.00
<br />$ 107.50
<br />$ 3,762.50
<br />$ 24.09
<br />$ 843.15
<br />87
<br />2557.603
<br />WOODEN FENCE
<br />112
<br />LF
<br />$ 25.00
<br />$ 2,800.00
<br />$ 20.96
<br />$ 2,347.52
<br />$ 21.46
<br />$ 2,403.52
<br />88
<br />2557.603
<br />INSTALL SALVAGED FENCE
<br />50
<br />LF
<br />$ 35.00
<br />$ 1,750.00
<br />$ 31.18
<br />$ 1,559.00
<br />$ 31.47
<br />$ 1,573.50
<br />89
<br />2563.601
<br />TRAFFIC CONTROL
<br />1
<br />LS
<br />$ 10,000.00
<br />$ 10,000.00
<br />$ 8,062.50
<br />$ 8,062.50
<br />$ 25,273.93
<br />$ 25,273.93
<br />90
<br />2564.531
<br />SIGN PANELS TYPE C (INCLUDING POSTS & ASSEMBLY)
<br />313
<br />SF
<br />$ 22.00
<br />$ 6,886.00
<br />$ 23.38
<br />$ 7,317.94
<br />$ 21.46
<br />$ 6,716.98
<br />91
<br />2564.531
<br />SIGN PANELS TYPE D (INCLUDING POSTS & ASSEMBLY)
<br />59
<br />SF
<br />$ 30.00
<br />$ 1,770.00
<br />$ 30.10
<br />$ 1,775.90
<br />$ 26.20
<br />$ 1,545.80
<br />92
<br />2564.536
<br />INSTALL SIGN (INCL. POST & ASSEMBLY)
<br />20
<br />EA
<br />$ 35.00
<br />$ 700.00
<br />$ 37.63
<br />$ 752.60
<br />$ 48.31
<br />$ 966.20
<br />93
<br />2564.550
<br />DELINEATOR TYPE (X4 -2)
<br />6
<br />EA
<br />$ 50.00
<br />$ 300.00
<br />$ 53.75
<br />$ 322.50
<br />$ 48.05
<br />$ 288.30
<br />94
<br />2564.603
<br />PVMT MARK. 24' STOP LINE WHITE -POLY PREFORMED
<br />143
<br />LF
<br />$ 17.00
<br />$ 2,431.00
<br />$ 15.52
<br />$ 2,219.36
<br />$ 16.13
<br />$ 2,306.59
<br />95
<br />2564.603
<br />PVMT MARK. 4" DOUBLE SOLID LINE YELLOW -PAINT
<br />4520
<br />LF
<br />$ 0.40
<br />$ 1,808.00
<br />$ 0.34
<br />$ 1,536.80
<br />$ 1.26
<br />$ 5,695.20
<br />96
<br />2564.603
<br />PVMT MARK. 4" SOLID LINE WHITE -PAINT
<br />9480
<br />LF
<br />$ 0.20
<br />$ 1,896.00
<br />$ 0.16
<br />$ 1,516.80
<br />$ 1.09
<br />$ 10,333.20
<br />97
<br />2564.618
<br />ZEBRA CROSSWALK- WHITE POLY PREFORMED
<br />216
<br />SF
<br />$ 12.00
<br />$ 2,592.00
<br />$ 10.61
<br />$ 2,291.76
<br />$ 11.32
<br />$ 2,445.12
<br />98
<br />2565.602
<br />PEDESTAL FOUNDATION
<br />1
<br />EA
<br />$ 300.00
<br />$ 300.00
<br />$ 750.00
<br />$ 750.00
<br />$ 264.19
<br />$ 264.19
<br />99
<br />2565.603
<br />1.25' RIGID STEEL CONDUIT
<br />30
<br />LF
<br />$ 10.00
<br />$ 300.00
<br />$ 18.50
<br />$ 555.00
<br />$ • 6.19
<br />$ 185.70
<br />100
<br />2565.616
<br />RELOCATE CROSSWALK WARNING FLASHER SYSTEM
<br />1
<br />SYS
<br />$ 4,000.00
<br />$ 4,000.00
<br />$ 7,471.25
<br />$ 7,471.25
<br />$ 7,898.94
<br />$ 7,898.94
<br />101
<br />2571.541
<br />TRANSPLANT TREE (3' CAL DECIDUOUS)
<br />79
<br />TREE
<br />$ 110.00
<br />$ 8,690.00
<br />$ 53.75
<br />$ 4,246.25
<br />$ 10623
<br />$ 8,392.17
<br />102
<br />2573.502
<br />SILT FENCE, TYPE PREASSEMBLED
<br />6866
<br />LF
<br />$ 2.00
<br />$ 13,732.00
<br />$ 1.83
<br />$ 12,564.78
<br />$ 2.72
<br />$ 18,675.52
<br />103
<br />2573.602
<br />INLET PROTECTION
<br />49
<br />EA
<br />$ 100.00
<br />$ 4,900.00
<br />$ 107.50
<br />$ 5,267.50
<br />$ 58.84
<br />$ 2,883.16
<br />104
<br />2575.505
<br />SODDING TYPE SALT RESISTANT
<br />15000
<br />SY
<br />$ 2.00
<br />$ 30,000.00
<br />$ 1.94
<br />$ 29,100.00
<br />$ 3.16
<br />$ 47,400.00
<br />105
<br />2575.604
<br />EROSION CONTROL BLANKET
<br />6660
<br />SY
<br />$ 1.20
<br />$ 7,992.00
<br />$ 1.13
<br />$ 7,525.80
<br />$ 3.15
<br />$ 20,979.00
<br />106
<br />2575.605
<br />SEEDING (INCL. SEED MIX 50B OR 608, FERTILIZER, MULCH &
<br />DISC ANCHORING)
<br />4.3
<br />ACRE
<br />$ 850.00
<br />$ 3,655.00
<br />$ 84925
<br />$ 3,651.78
<br />$ 922.55
<br />$ 3,966.97
<br />TOTAL BID AMOUNT
<br />$ 1,576,445.70
<br />$ 1,738,903.49
<br />$ 1,770,639.24
<br />Page 6
<br />
|