My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/13/1992 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
1992
>
04/13/1992 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 12:21:31 PM
Creation date
12/11/2014 10:38:23 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
04/13/1992
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 260 <br />COST SHARING PROPOSAL <br />CSAH 10 Realignment, Sunrise Drive Cul -De -Sac <br />and Glen View Drive Extension <br />Improvements Funded by Anoka County, for CSAH 10 Realignment; West End of Con- <br />struction to the Intersection of .GSAH 23 - - <br />Thru lanes <br />Turn lanes <br />Shoulders <br />Channelization <br />50% of curb and gutter along outside edges of roadway <br />• <br />Contributing flow for storm sewers <br />Grading, turf establishment and erosion control <br />Construction engineering costs up to 8% of Anoka County's construction cost <br />Improvements Funded by City of Lino Lakes <br />50% of curb and gutter along outside edges of roadway <br />Contributing flow for storm sewers <br />City utility (sanitary sewer and watermain) relocations and adjustments <br />Construction engineering cost less Anoka County's and City of Circle Pines share <br />of construction cost <br />Right -of -way <br />Design engineering less City of Circle Pines share <br />Improvements Funded by the City of Circle Pines <br />50% of curb and gutter along outside edges of roadway <br />Contributing flow for storm sewers <br />City utility (sanitary sewer and watermain) relocations and adjustments <br />Construction engineering cost up to 8% of city construction cost <br />Design engineering relating to construction cost <br />1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.