Laserfiche WebLink
• <br />AGENDA ITEM 7F <br />STAFF ORIGINATOR: John Powell, City Engineer <br />COUNCIL MEETING DATE: May 14, 2001 <br />TOPIC: Resolution No. 01 - 58, Ordering Preparation of a Feasibility Study <br />for the 2002 -2003 Street Reconstruction Program. <br />VOTE REQUIRED: Simple Majority <br />BACKGROUND: <br />On March 12, 2001, the City Council directed staff to review the proposed street <br />reconstruction program to determine whether or not alterations to the priority ranking <br />should be made. Staff has reviewed the existing land use, the existing MUSA line, the <br />draft - proposed MUSA phasing, and the existing utility system. We do not recommend <br />altering the Street Reconstruction Program order. <br />The attached resolution orders the preparation of a feasibility study to investigate the <br />reconstruction of the following streets located in the City: <br />Street From Segment <br />Rice Court <br />Hokah Court <br />Hokah Drive <br />Totem Trail <br />Arrowhead Drive <br />West Shadow Lake Drive <br />Lamotte Drive <br />Lamotte Circle <br />Marilyn Drive <br />Barbara Lane <br />Totem Trail <br />Hokah Drive <br />Totem Trail <br />Arrowhead Drive <br />Ware Road <br />Birch Street <br />County Road <br />Lamotte Drive <br />77th Street <br />Marilyn Drive <br />To Segment <br />Cul -de -sac <br />Cul -de -sac <br />Birch Street <br />Birch Street <br />Tomahawk Trail <br />Northern End <br />City Limit <br />Cul -de -sac <br />Highland Meadows West <br />Cul -de -sac <br />This listing recognizes that Ware Road has already been reconstructed, that Elm Street <br />will likely be reconstructed as a Municipal State Aid roadway; and that two years worth <br />of construction is to be considered. <br />The study will consider utility issues, wetland impacts, road section and other matters <br />related to reconstructing the streets. Public information meetings and other public <br />participation is planned to familiarize residents and other property owners on the City <br />Charter and public improvement process. A preliminary schedule has been attached. <br />Pursuant to Minnesota Statutes, Chapter 429, and the Lino Lakes Charter, Council is <br />required to order the preparation of a report studying the proposed improvements. <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution No. 01 -58, Ordering Preparation of a Feasibility Study for the <br />2002 -2003 Street Reconstruction Program. <br />RECOMMENDATION: <br />Option No. 2 - Staff recommends that Resolution No. 01 -58 be adopted. <br />