12/13/71 <br />ed paying. This included a change order which should be signed. The contract <br />amount of the.well was $14,693 plus the additional for the change order for a <br />12" casing. He noted that the original specs had called for a well delivering <br />6000 gallons per minutes; the new casing is producing as high as 18,000 <br />gallons per minutes or 3 times as much. Mr. Rosengren moved to pay the final <br />payments to Keys Well Drilling in the amount of $15,988.00 and to sign the <br />change order. Seconded by Mr. Cardinal. Carried unanimously. <br />Mr. Gotwald read his recommending letter on partial estimate No. 1 from <br />Marvin Rehbein Contracting and recommended paying the amount of $113,941.93. <br />Mr. Rosengren moved to pay the bill from Marvin Rehbein for work as of <br />November 1, 1971 in the amount of $113,941.93. Seconded by Mr. Cardinal. <br />Carried unanimously. <br />Mr. Gotwald produced a change order from Marvin Rehbein which entailed a <br />change in the original plans. Mr. Gotwald felt that the change was necessary <br />and showed diagrams of the change.. It would eliminate the planned sewer <br />lines in Pheasant Run and Captain's Place and would add sewer line across the <br />golf course and in Cutlass Circle. The trenching will be different since <br />this spot is extremely wet. The contractor wants approximately $24/ft. for <br />trenching which is, $12 more per foot than for trenching in the eliminated <br />area which is dry. George. had checked the trenching cost of the next lowest <br />bidder and found that the Johnson Bros. price was .$32 /ft. at the same level, <br />and that the other bidders were higher yet, so that he felt this request <br />was reasonable. The amount of footage agreed to was a maximum of 567 feet <br />to be trenched. Mr. Gotwald stated that the end result will be no greater <br />than originally bid. There was discussion. Mr. Gotwald noted that the reason <br />Mary had the low bid was that he knew that a considerable portion of the <br />land was dry since clay. <br />Mr. Gotwald stated that this change would give Jandric a chance to develop <br />several additional lots along Cutlass, Circle; also, Jandric had no immediate <br />plans to develop along Pheasant. Run and Captain's Place because this is low <br />land which would require much filling and testing before building permits <br />are allowed. Mr. Gotwald will produce tracings showing the as-builts when <br />the sewer lines are done. He noted that the water line was to have been put <br />across the golf course now anyway, and that it would have been difficult to <br />have put in a deeper sewer line only 10 feey away later. Answering a ques- <br />tion from Don Metier, George stated that the footage being eliminated is <br />about 100 ft. The minimum depth is 10 ft., the deepest on this job is 18 ft. <br />to 22 ft., this portion 14 ft. to 16 ft. deep. The difference in cost per <br />foot between the 2 acreas is $12.00; the additional cost on the change order <br />if they put in the entire 567 ft. will be about $400 more. We will get a <br />refund if there is less footage. Carley has a fulltime inspector on the <br />job wheneven ehbein turns a shovel. <br />Mrs. Swanson asked who owned the golf course and was told Jandric. She was <br />also told that the residential area wraps around the golf course, and that <br />the area to be served with sewer was more apt to be used than that in the <br />section being eliminated, as well as other information. Mr. Gotwald noted <br />that the average elevation above the lake in that area is 8 or 9 feet. Mr. <br />Bohjanen asked if this would come under the amound bid and was told yes. <br />Mr. L'Allier reiterated what was included in the change order. Mr. Bohjanen <br />noted that the project to be eliminated would have to be re- entered later as <br />a separate improvement. Mr. Rosengren moved to approve the change order as <br />requested by Marvin Rehbein Contracting Co. with the stipulation that the <br />eliminations be included in writing on the change order. Seconded by Mr. <br />