Laserfiche WebLink
1.1 <br />in the Lakeview Area. Second by Ross, motion carried. <br />Backlin stated he would also like to have the engineer check with Jake <br />Lundheim on the situation existing on 22nd regarding the wooden bridge <br />there. If this is to be a service road, it was suggested that perhaps <br />the county would do the work on the road itself and the State would build <br />the approaches, with the possibility of applying funds to extend the cul- <br />vert all the way through under 22nd. <br />Backlin motioned to have the engineer stake out West Holly. Second by <br />Speiser, carried. <br />Mr. Gottwald replied he had been out and checked on East Holly where it <br />turns North on to 12th Avenue, and stated the road was in excellent con- <br />dition. A bid had been received to complete 1 -9/10 miles with the same <br />treatment that Ware Road was finished with last year. However, he felt <br />that in the spring the price would be considerably lower, and it was a- <br />greed to table to consider this work again next spring. <br />Speiser and Gottwald discussed the three bids received for surfacing the <br />playground and multiple use area. These were received from Schifsky & <br />Son in the amount of 0,150; Dunkley Surfacing Company for 0,243 and <br />Hennepin Blacktmpping for :3,7$3.90. Ross moved the bids be tabled for <br />further discussion, Speiser seconded, motion carried. Each bid was in <br />two parts. <br />Ross reported the Planning & Zoning Committee meeting will be this com- <br />;` ing Wednesday, and they will be discussing a plumbing and heating ordin- <br />ance with a master plumber invited to give them information. Ross also <br />asked Mr. Burque where the gas lines should run, reminding him that they <br />should follow section lines. <br />The Civil Service Commission appointed was as follows: Mr. Kelling(Ross) <br />Mr. Rosengren, (Speiser) Mr. Juleen (Backlin) Loyola Thiltgen (Zelinka) <br />and NIr. Backlin (Domning). <br />The filing dates for the November 2 election will be from September 21 <br />to October 5. Positions open will be for Mayor, two Trustees and 1 Con- <br />stable, and Treasurer. <br />Discussion was brought up on a village hall, and 1 or 2 possible sites <br />were discussed. It was agreed that at our next meeting we will appoint a <br />committee to look at possible building sites during the coming year. <br />Gerald Clausen, 6109 Baldwin Lake Road, spoke at length and read various <br />excerpts from publications on the results in the area of the many years <br />of spraying by theMetropolitan Mosquito Control. No council action was <br />taken, although Mr. Clausen felt the council should make a protest to stop <br />spraying in the village. <br />Mr. Gottwald turned in 25 village maps to the Council. He also asked to <br />have a certified copy of the approval to revise the sidewalks (discussed <br />at meeting on 9/13) sent to the Highway Department. <br />Access to the Rudrogen property was brought up for discussion, and the <br />price quoted for building a road from his east property line to Center- <br />ville Road, approximately 1/2 mile long, would be 4,;24,331.00. Other <br />