My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/26/1993 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
1993
>
07/26/1993 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2015 1:31:49 PM
Creation date
1/9/2015 12:10:36 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
07/26/1993
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
260 <br />COUNCIL MEETING JULY 26, 1993 <br />Council Member Bergeson moved to adopt Emergency Ordinance No. 93 <br />- 11 Requiring a Minimum Area for Unsewered Lots. Council Member <br />Kuether seconded the motion. Motion carried unanimously. <br />Emergency Ordinance No. 93 - 11 can be found at the end of these <br />minutes. <br />ENGINEER'S REPORT <br />Resolution No. 43 - 93 Accepting Bid for Phase II, Apollo Drive <br />Mr. Powell explained that Resolution No. 93 - 28 was passed at <br />the June 28, 1993 City Council meeting approving the plans and <br />specifications and ordering bids for this above described <br />project. The bids were received and opened on Friday, July 23, <br />1993. The bids have been tabulated and the lowest responsible <br />bidder is C. W. Houle, Inc. This company is a responsible and <br />qualified bidder. <br />Mr. Powell described Apollo Drive, Phase II noting that this <br />construction will complete Apollo Drive from near the water tower <br />to Lilac Street. <br />Council Member Elliott moved to adopt Resolution No. 43 - 93 <br />Awarding Bid to C. W. Houle, Inc. for $574,038.45. Council <br />Member Kuether seconded the motion. Motion carried unanimously. <br />Resolution No. 43 - 93 can be found at the end of these minutes. <br />Resolution No. 44 - 93, Ordering Preparation of Plans, 1993 Wear <br />Course Installation Improvement and Resolution No. 45 - 93 <br />Approving Plans and Ordering Advertisement for Bids, 1993 Wear <br />Course Installation Improvement - Mr. Schneider explained that <br />bituminous wearing courses are not installed in subdivisions <br />until 80% of the lots have been built on. He also explained that <br />in new developments, park trails are constructed by the developer <br />through the aggregate base leaving only the bituminous surface <br />for the City to complete. Bituminous surfacing is phased in this <br />manner to minimize the likelihood of it being damaged by other <br />construction activity after it has been installed. There are <br />several subdivisions where it is now appropriate to complete the <br />roadway and trail surfacing. All of this surfacing work has been <br />combined into one (1) larger project to be more cost effective. <br />The resolutions ordering the plans and specifications and <br />approving them are being submitted together to allow the project <br />to be advertised as soon as possible which would enable the <br />surfacing to be completed in 1993. <br />Council Member Kuether moved to adopt Resolution No. 44 - 93 <br />Ordering Preparation of Plans and Specifications for the 1993 <br />PAGE 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.