My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-11-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
08-11-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 4:19:50 PM
Creation date
1/14/2015 2:27:42 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/11/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB will print, assemble, and submit the final contract documents to the City and <br />request authorization to advertise the project for bidding. WSB will receive and <br />respond to bidder inquiries concerning the plans, specifications, and intent of the <br />project. Logs of all inquiries will be kept and maintained to document inquiries. <br />WSB will attend the project bid opening with the City. <br />WSB will review the low bidder's bid proposal, contractor's and subcontractor's <br />personnel proposed for the project and relative experience, quality and availability <br />of equipment, performance on similar projects, references, nature and extent of <br />other similar contracts, whether or not the contractor or subcontractors have ever <br />been denied contract award, and any other information that would affect the <br />ability of the contractor to perform the work. We will then make a <br />recommendation for the City Council's review and approval. <br />WSB will assist in obtaining approvals from governmental authorities having <br />jurisdiction over the project if it is determined that they are needed. It is assumed <br />that the developer will obtain a Rice Creek Watershed District permit and Anoka <br />County right of way permit as part of their development approvals. It is also <br />assumed that the developer's engineer will have completed the preliminary plans <br />for the project and will be able to provide a copy of the plans in an electronic <br />format. <br />The engineering fee to complete the Century Farm North 6th Addition Project is $52,000 (not <br />to exceed). <br />This letter represents our complete understanding of the NorthPointe Roadway and Utility <br />Improvement project and the proposed scope of services. <br />If you have any questions about this proposal, please feel free to call me at 612-360-1298. <br />Sincerely, <br />WSB & Associates, Inc. <br />Diane Hankee, PE <br />Associate Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.