My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-24-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
11-24-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2015 3:48:19 PM
Creation date
1/15/2015 11:40:23 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/24/2014
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 1007.022 CERTIFICATE OF OCCUPANCY. <br />(1) No person may change the use of any land except for construction of essential services <br />and transmission lines or occupy or utilize a new structurally altered building (except single- <br />family detached dwellings or their accessory buildings or private garages in any district) or <br />change the use of any building after the effective date of this ordinance unless he has first <br />obtained a certificate of occupancy. <br />(2) Application for a certificate of occupancy for a new building or for an existing building <br />which has been so altered or the reuse of any land may be filed with the Building Official any <br />time after the application for a building permit. The Certificate of Occupancy shall be issued <br />within ten (10) days after the construction or alteration of such building or part thereof or site has <br />been completed in conformity with the provisions of this ordinance and building code. Pending <br />the issuance of said certificate, a temporary certificate of occupancy may be issued, subject to the <br />provisions of the building code and zoning ordinance for a period not to exceed twelve (12) <br />months during the completion of the erection or the alteration of such a building. The temporary <br />certificate shall not be construed as in any way altering the respective rights, duties or obligations <br />of the owners or of the community relating to the use or occupancy of the premises or any other <br />matter, except under such restrictions and provisions as will adequately insure the safety of the <br />occupants. The use of any structure for which a building permit is required or the use of any land <br />shall be considered a violation of this ordinance unless a certificate of occupancy has been <br />issued. <br />(3) Application for a certificate of occupancy for a new use of land shall be made to the <br />Building Official before any such land shall be so used. Such certificate of occupancy shall be <br />issued within ten (10) days after this application if the use is in conformity with the provisions of <br />this ordinance. <br />(4) A record of all certificates of occupancy shall be kept on file with the City. <br />2-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.