Laserfiche WebLink
i <br />.. 41) <br />COUNCIL MEETING AUGUST 22, 1994 <br />be raised to $7.00 per fixture or $70.00 for each new home, the <br />mechanical permit fee be raised to $60.00 per home and fireplace <br />fee be raised to $25.00. <br />Council Member Kuether asked how many inspections are needed for <br />a new fireplace. Mr. Kluegel said usually two (2). He noted <br />that the state code does provide for a re -inspection fee. <br />Council Member Bergeson said that he would suggest that the new <br />fees be effective January 1, 1995 and that all building <br />contractors should be notified in advance of the increase. <br />Council Member Bergeson moved to adopt Resolution No. 94 - 66 <br />increasing the plumbing permit fee to $7.00 per fixture, the <br />mechanical permit fee to $60.00 and the fireplace permit fee to <br />$25.00 and the implementation date be January 1, 1995. Council <br />Member Neal seconded the motion. Motion carried unanimously. <br />Resolution No. 94 - 66 can be found at the end of these minutes. <br />PLANNING AND ZONING BOARD REPORT, MARY KAY WYLAND <br />Consideration of a Rezone for Behm's Century Farms and MUSA <br />Considerations, FIRST READING, Ordinance No. 15 - 94 - Mr. <br />Brixius explained that at the August 10, 1994 Planning and Zoning <br />Board meeting, reconsideration of the Behm's rezoning and <br />memorandum of August 5, 1994 were considered. A number of <br />conditions were presented in this memorandum: <br />1. The MUSA expansion to include Behm's Century Farms be done <br />as part of a comprehensive City-wide MUSA expansion, not as <br />a MUSA land trade. <br />2. The future plat must comply with R-1 minimum lot areas, <br />width and depth standards. <br />3. The developer is responsible for the full,cost of utility <br />extension bringing municipal sewer and water to the site. <br />4. The plat design must provide sensitivity and protection of <br />the Lino Airpark runway to avoid future land use complaints. <br />5. The developer pursue a variance for the Thomas Street cul- <br />de-sac length. <br />6. The developer submit a phasing plan that will outline the <br />staged development of the plat. <br />7. All grading, drainage, wetland litigation be reviewed and <br />PAGE 6 <br />1 <br />1 <br />1 <br />