My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/16/1994 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
1994
>
11/16/1994 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 9:55:32 AM
Creation date
1/22/2015 9:20:12 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
11/16/1994
Council Meeting Type
Joint
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />JOINT COUNCIL MEETING <br />WITH THE CITY OF HUGO <br />CITY OF LINO LAKES <br />COUNCIL MINUTES <br />NOVEMBER 16, 1994 <br />DATE November 16, <br />TIME STARTED : 7:30 P.M. <br />TIME ENDED :! 10:00 P.M. <br />MEMBERS PRESENT: Reinert, Elliott, Bergeson <br />MEMBERS ABSENT : Kuether and Neal <br />Staff members present: Acting City Engineer, John Powell, City <br />Administrator, Randy Schumacher and Clerk -Treasurer Marilyn <br />Anderson. City of Hugo Council members: Francis Miron, Debra <br />Barnes and Jim LeRoux. Newly elected Hugo Council members Marvin <br />LaValle and Andy Goiffon, Hugo City Administrator Bob Museus and <br />Consulting Engineer, Joel Dresel were also present. <br />The purpose of the meeting, which was held at the White Bear <br />Country Inn, was to discuss issues of mutual interest to both the <br />City of Lino Lakes and the City of Hugo. <br />The City of Lino Lakes and the City of Hugo have entered into an <br />agreement to prepare a study of the Clearwater Creek drainage <br />area. The study is being prepared by Hugo's consulting engineer, <br />OSM and is expected to be completed in February, 1995. Rice <br />Creek Watershed District (RCWD) is aware that the study is being <br />prepared and has noted that it meets their criteria. Mr. Dresel <br />said that he would present the completed study to both the City <br />of Lino Lakes and the City of Hugo. <br />Mr. LaValle and Mr. Miron discussed elements of the study noting <br />that the intention was to coordinate the study with RCWD because <br />the study area involves several entities as well as Bald Eagle <br />Lake, Otter Lake and the entire Clear Watercreek area. Mr. Miron <br />said he could envision a control structure at Bald Eagle Lake and <br />a revision of the structure that lies under I35E. The result of <br />the study will be a plan to control drainage in the entire <br />Clearwater Creek basin. The impact of the plan will be known and <br />communicated to the public to avoid a situation that now is <br />occurring in the City of Centerville. <br />Mr. LaValle explained that when I35E was constructed, a mistake <br />PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.