My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/19/1995 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
1995
>
04/19/1995 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 12:00:47 PM
Creation date
1/23/2015 1:25:07 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
04/19/1995
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cc/ <br />COUNCIL WORK SESSION <br />April 19, 1995 <br />connecting to the Hugo Water System. Mr. Powell indicated that we <br />should check into what kind of pressure there would be at the end <br />of a 5,000' stub. Then we can consider the options. The proposed <br />well and a tank would allow us to extend utilities to the west side <br />of the freeway. The Mayor and Linda Elliot agreed that we should <br />look at our own system and how best to manage it. <br />Clearwater Creek Drainage Study: OSM has submitted a report to <br />Rice Creek on this drainage area. Our Surface Water Management <br />Plan provides for collection of funds to be used for specific <br />drainage areas - along with the Clearwater Creek Development, we <br />could direct that their SWM Funds be kept in a separate account for <br />Clearwater Creek Drainage improvements. Mr. Powell further <br />explained that we have criteria within our Surface Water Management <br />Plan for capital improvements, <br />Public Improvement Update: Mr. Powell explained that he had met <br />with MnDot and the County regarding public improvements for the <br />coming construction season. They include the following: <br />MnDot Hwy 49 overlay from Hwy 96 to 49/23 (Correctional <br />Facility) <br />Bridge over 35E at 80th Street <br />County 49/23 Realignment <br />Main Street to 4th Avenue - some restoration <br />Overlay on Otter Lake Road (Main Street south to <br />Otter Lake Drive <br />Bridge repair by park <br />City Hodgson Road Trunk Watermain <br />Woods of Baldwin II <br />Country Lakes Estates Phase II <br />Pine Ridge III (Developer) <br />49/23 (meeting with Co. next week) <br />Black Duck Lift Station <br />Well II and IV <br />Trappers Crossing <br />Clearwater Creek <br />Anoka County Assessment Pass Through Policy - The County will be <br />charging for assessment allocations - staff has determined that <br />these costs will be passed on to the Developer. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.