My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/09/1998 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
1998
>
03/09/1998 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2015 4:04:47 PM
Creation date
1/30/2015 11:24:39 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
03/09/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL MINUTES MARCH 9, 1998 <br />for payment No. 7 (final) in the amount of $23,328.52, including change orders 3 and 4. This <br />project, completed in the fall of 1996, included construction of trunk sanitary sewer and <br />watermain from Cedar Street to Main Street, providing utility service to the Clearwater Creek <br />Economic Development area. The final contract amount is summarized as follows: <br />Contract Amount to date <br />Change Order No. 3 <br />Change Order No. 4 <br />Final Contract Amount <br />$773,509.59 <br />64,129.95 <br />13,328.52 <br />$850,968.06 <br />Mr. Ahrens explained that Change Order No. 3 reflects the actual quantities installed by the <br />contractor compared to the estimated amounts by the Engineer, Change Order No. 4 includes <br />work to restore the fence at the Acton construction site and repair of the driveway, sign and <br />restoration of drainage at the Otter Lake Veterinary Clinic, and Change Orders No. 1 and 2 were <br />previously approved by Staff and include work to restore road access to Adgraphics and <br />Northern Wholesale, and completion of various items not included in the original contract. <br />Mayor Sullivan asked if the engineer involved in the bidding process would not have been aware <br />of the need to route utilities under the existing roadway. Mr. Ahrens explained that at the time of <br />the bid NSP's requirements with regard to affected power poles were not known. Mayor <br />Sullivan pointed out that this particular pole is a heavy transmission system structure. <br />Council Member Bergeson moved to adopt Resolution No. 98 - 34, as presented. Council <br />Member Lyden seconded the motion. Motion carried unanimously. <br />Resolution No. 98 - 34 can be found at the end of these minutes. <br />Consideration of Resolution No. 98 - 35, Approve Relocation Agreement with Northern <br />States Power Company, Otter Lake Realignment Project - Mr. Ahrens explained that the <br />planned realignment of Otter Lake Road impacts a guy wire supporting a Northern States Power <br />pole. This guy wire is located on private property, and not within the County right-of-way. <br />Therefore, the City is responsible for the cost of relocating the guy wire. This cost is estimated <br />to be $21,000 and would be assessed to benefiting property owners. Pursuant to the proposed <br />relocation agreement, NSP is requesting payment of 80% of that amount, or $16,800 to be paid <br />in advance. City Attorney Hawkins has reviewed the proposed agreement, and finds it to be in <br />order. <br />Mr. Ahrens pointed out that the original road realignment would have necessitated relocation of <br />the entire pole, at a cost to the City in excess of $140,000. Therefore, the realignment was <br />revised with County approval to reduce the impact to the guy wire only. Avoiding impact <br />completely would have required additional right-of-way from the property owner, which would <br />have created a narrow strip of undevelopable land between the power line easement and the road <br />right-of-way. Considering the above, Staff recommended relocation of the guy wire. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.