My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/12/1999 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
1999
>
04/12/1999 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2015 2:53:41 PM
Creation date
2/2/2015 1:53:58 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
04/12/1999
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL MINUTES APRIL 12, 1999 <br />Motion failed with Council Members Bergeson, Neal, and Mayor Sullivan voting no. <br />Council Member Bergeson moved to approve the rezoning from General Business to Planned <br />Development Overlay based on the following: <br />1. Only uses that are permitted uses in an LI zoning district will be part of this PDO. <br />2. A new landscaping plan, which includes significant screening along the clinic property <br />boundary, must be submitted and obtain approval from City staff. <br />3. A lighting plan must be submitted and obtain approval from City staff. <br />4. Trash areas must be screened. Plans for the fencing or walls must be submitted and <br />approved by appropriate city staff before building permits are issued. <br />5. A minimum of 20% of the site shall be green space. <br />6. Prior to issuance of building permits, building and llghtina lans must be reviewed by <br />the City CSO for CEPTED review. <br />7. Any signage shall conform to the sign ordinance and proper permits obtained. <br />8. Proper building permits must be obtained prior to any construction and 1% of the <br />construction costs must be,put in!escrow to insure completion of all site improvements. <br />9. All permits re <br />any site gradi. <br />ice ;Creek Watershed District shall be obtained prior to <br />• <br />• <br />10. Ut :'' wradg an drainage plans must obtain approval from the City Engineer. <br />11. The ing area shall be paved with curb and gutter and construction plans must <br />obtain ap oval from the City Engineer. <br />12. Park dedication fee shall be required as described by City regulations. <br />13. All comments from the City Engineer in memo dated March 4, 1999, must be <br />addressed to the satisfaction of the City Engineer. <br />14. Roof mechanical equipment must be screened visually and for noise. <br />15. A new access to Apollo Drive must be obtained on the south side of the property and <br />the existing driveway access to the PDO site must be closed off so that there is no longer <br />a shared access with the clinic property to the north. <br />16. Staff meets with representatives of Fogerty and the clinic to resolve concerns. <br />18 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.