My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/28/2002 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
2002
>
10/28/2002 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2015 1:56:54 PM
Creation date
2/6/2015 8:46:31 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
10/28/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />COUNCIL MINUTES OCTOBER 28, 2002 <br />pavement conditions and safety concerns through that section. To meet road design requirements <br />they will have to address super elevation. They have sight line issues and MSA requirements to <br />achieve the speed limit posted. <br />City Engineer Studenski noted that this section, from the intersection of Holly Drive and 12th <br />Avenue, north to Birch Street, has previously been reconstructed through the utility improvements. <br />There are stretches that have about three parcels where the bike path does not exist and there is a need <br />for a stormwater pond at that end which would follow in the subsequent year for reconstruction. The <br />first portion from Ash Street to Holly Court is the least populated and deterioration of road conditions <br />are the most significant issue at this time. <br />City Engineer Studenski explained that with right-of-way acquisitions, it is mostly due to wetland <br />areas, slope and drainage easements, and dealing with wetlands. Regarding the street, it will basically <br />follow the existing alignment. The curbs will require some adjustment due to MSA standards. The <br />storm sewer will be fairly extensive due to the lack of drainage and being within a ditch section. The <br />trail will also connect on the east side of 12th Avenue and staff is:proposing that it continue westerly <br />from the intersection of 12th Avenue South and Holly Drive to. Cassiopeia Court to link back into the <br />trail system currently underway on the north side, connecting it to the park just south of Birch Street. <br />City Engineer Studenski stated the sanitary sewer and water will have minimal impact at this point. <br />He reviewed Exhibits E-1 and E-2, noting the proposal is to provide for future connections without <br />tearing up the road. He pointed out the area wherewater would be extended from under the street and <br />into the boulevard for future extension to the south He stated the sanitary sewer is extremely shallow <br />so any extension to the south would require a lift station and force main. Additional utility <br />improvements at the intersection of 12th Avenue and Holly Drive would be set up for ease of future <br />extensions. <br />City Engineer Studenski stated the assessmentsTor street and storm improvements would be against <br />properties that front 12th Avenue and Holly Drive. The watermain and sanitary sewer will be covered <br />under the trunk funds since rt will lot be benefiting any specific property since stubs would be placed <br />for future connections. The total estimated cost is about $4.2 million with $3.6 million from MSA <br />funds, $474,000 from the Surface. Water Management Fund, $7,000 from the Trunk Area Unit Fund, <br />and $69,000 of assessments. He stated a significant portion of the cost is due to the easements and <br />wetland mitigation on this project. <br />Community Development Director Grochala stated this is a substantial project and due to the late <br />hour, the Council could accept the report and review it before the next work session. <br />City Engineer Studenski stated work is not anticipated until some time next year. <br />Councilmember Reinert moved to adopt Resolution No. 02-161, Accepting the Feasibility Report for <br />12`h Avenue/Holly Drive Street Reconstruction Project. Councilmember O'Donnell seconded the <br />motion. <br />Motion carried unanimously. <br />35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.