My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/13/2003 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
2003
>
01/13/2003 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2015 1:59:29 PM
Creation date
2/6/2015 11:15:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
01/13/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL MINUTES JANUARY 13, 2003 <br />APPROVED <br />• sewer costs, the proposed assessment of $72,000 would be an additional cost to the Surface Water <br />• <br />• <br />Management fund or require a referendum. <br />City Engineer Studenski noted that a majority of the residents have petitioned for sanitary sewer and <br />watermain and in accordance with the City Charter, would be assessed for the improvements. <br />Therefore, it is staff's recommendation to authorize the preparation of plans and specifications for the <br />sanitary sewer and watermain improvements. <br />Councilmember Carlson noted the deteriorating condition of 62nd Street between Ware Road and <br />Red Maple Lane and that 13 of 19 residents requested design considerations of utility extensions onto <br />Red Maple Lane. She stated that it was discussed at a work session that this may stop at West <br />Shadow Lake Drive. City Engineer Studenski stated the residents who opposed were at the easterly <br />extension and staff would, through plans and specifications, review how and what benefit would be <br />taken on by the City if that were to be shortened up. At this point, it appears that by shortening it, the <br />project would still be able to address the concerns of residents. But, staff wants to set it up so the City <br />does not incur the additional cost of utilities or road at the east end. <br />Councilmember Carlson asked about the referendum for Red Maple Lane. City Engineer Studenski <br />stated that could be dropped off and all reconstructions go through a referendum. He explained that if <br />it goes through a referendum, the City could apply for MSA with the remainder going to the <br />referendum. <br />Councilmember Carlson noted that those who petitioned would be assessed for improvements and <br />asked what happens if the costs are greater than the benefiting value of the improvement. <br />City Engineer Studenski explained the process to authorize plans and specifications and go out for <br />bids. Once the bids are received, a public hearing will be held on the assessments. At that point, the <br />schedule will allow time if there are any challenges to those assessments. If issues are brought up at <br />that point, the Council would have the ability to not award the contract. City Engineer Studenski <br />stated that extra time frame is included in the schedule to eliminate any challenging of the project <br />after the project is awarded. <br />Councilmember O'Donnell noted the staff report says the proposed assessment would come from the <br />Surface Water Management Fund or a referendum and asked how that will be decided. City Engineer <br />Studenski stated it is a Council decision. <br />Councilmember O'Donnell asked about a possible Comprehensive Plan change and what that would <br />involve. Community Development Director Grochala stated the property is located south of 62nd <br />Street and designated as Low Density, Unsewered Residential as a land use in the Comprehensive <br />Plan. The Plan says that sewer and water cannot be extended to those properties unless by petition <br />and amendment of the Comprehensive Plan. Therefore the Comprehensive Plan needs to be amended <br />to Low Density, Sewered, MUSA needs to be allocated, and the growth area changed. That would <br />require going through not only the Planning Commission and Council to approve the land use <br />amendment but also the Metropolitan Council. In discussion with the property owners, it was implied <br />that the Comprehensive Plan amendment would occur concurrently with the project. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.