Laserfiche WebLink
7300 WEST 147TH STREET SUITE 504 APPLE VALLEY, MN 55124-7580 (952) 431-4433 <br />MEMORANDUM: <br />PROJECT: <br />CNH NO: <br />DATE: <br />TO: <br />SUBJECT: <br />Lino Lakes Fire Station <br />14045 <br />February 17, 2015 <br />City of Lino Lakes - Mayor and City Council <br />Bid Results Summary and Recommendations <br />027 <br />The following is a summary of the bidding process and results, review of the apparent low bid <br />general contractor and recommendations for City Council consideration for the Lino Lakes Fire <br />Station project. <br />Bid Process <br />The pre-bid process went smoothly and there was significant general contractor as well as <br />subcontractor interest in this project. This was evident by the large number of general contractors <br />obtaining bidding documents, the significant quantity of product substitution submittals received by <br />our office, and the high volume of requests for bidder lists we responded to. <br />Bid Results <br />The bids for the Fire Station were received on February 12, 2014, based on the plans and <br />specifications developed by CNH Architects and our consultant team. The bids were opened and <br />read aloud to all in attendance. There were twelve conforming bids submitted by general contractors <br />as shown in the table below. <br />General Contractor <br />Base Bid + Alt 1-4 <br />Alternate 5 <br />Jorgenson Construction <br />$3,847,100.00 <br />-$15,800 <br />Langer Construction <br />$3,913,000.00 <br />-$18,000 <br />Parkos Construction <br />$3,915,750.00 <br />-$15,800 <br />Ebert Construction <br />$3,945,676.00 <br />-$15,737 <br />Donlar Construction <br />$4,080,000.00 <br />-$20,000 <br />Tarraf Construction <br />$4,041,000.00 <br />-$16,000 <br />Morcon Construction <br />$4,089,300.00 <br />-$20,000 <br />Rochon Corporation <br />$4,122,100.00 <br />-$15,800 <br />Weber Companies <br />$4,056,000.00 <br />-$13,500 <br />Mark Haug Construction <br />$4,152,245.00 <br />-$15,000 <br />CM Construction Company <br />$4,148,700.00 <br />-$15,000 <br />Terra General Contractors <br />$4,779,637.00 <br />-$15,800 <br />As noted above, the bids were relatively tight with the apparent low bidder, Jorgenson Construction, <br />being just 2.5% below the next grouping of three contractors all of which were in the $3.9 million <br />range. In addition to the 12 bidders shown above, three general contractors on the plan holder list <br />did not submit bids and one bid submitted was determined by the City Attorney to be <br />nonconforming. The low base bid of $3,498,000 for the fire station without internal road is <br />approximately 10% below the cost estimates provided. <br />P:\PROJECTS\2014\14045\4 - BIDDING\BID RESULTS AND RECOMMENDATIONS.DOCX <br />