My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-13-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
04-13-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2015 3:15:53 PM
Creation date
4/28/2015 12:42:21 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/13/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6E <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br />MEETING DATE: April 13, 2015 <br />TOPIC: Resolution No. 15-35, Accepting bids and Awarding a Construction Contract, <br />Birch Street & Centerville Road Street and Trunk Utility Improvements <br />VOTE REQUIRED: 3/5 <br />INTRODUCTION <br />Staff is requesting authorization to accept bids and award bids for the Birch Street & Centerville Road <br />Street and Trunk Utility Improvements contract. <br />BACKGROUND <br />Bids were received for the above -referenced project on Thursday, April 2, 2015, and were opened and <br />read aloud. Two bids were received. The bids were checked for mathematical accuracy and tabulated. <br />Contractor Amount of bid <br />Dresel Contracting, Inc. $631,759.75 <br />A-1 Excavating, Inc. $839,025.00 <br />Engineer's Opinion of Cost $674,665.00 <br />The low bid as submitted by Dresel Contracting, Inc., Chisago City, Minnesota, in the amount of <br />$631,759.75. The estimated total project cost including a construction contingency, engineering, legal and <br />bonding is $950,000.00. Approximately 60% of the project is trunk sewer and watermain improvements and <br />funded from the trunk utility fund. <br />The substantial completion date for this project is August 31, 2015 and the final completion date including <br />restoration is September 30, 2015. <br />RECOMMENDATION <br />Staff recommends adoption of Resolution No. 15-35, Accepting bids and Awarding a Construction Contract, <br />Birch Street & Centerville Road Street and Trunk Utility Improvements, in the amount of $631,759.75 to <br />Dresel Contracting, Inc. <br />ATTACHMENTS <br />1. Resolution No. 15-35 <br />2. Bid Tabulation <br />
The URL can be used to link to this page
Your browser does not support the video tag.