My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-04-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
05-04-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 12:48:46 PM
Creation date
5/1/2015 12:36:25 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/04/2015
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Lino Lakes, MN <br />Location: Lino Lakes (tower located on 35W) <br />Questions: <br />Will we need approval to access the tower? If so, from who? <br />Will there be any concern from the city regarding parking and/ <br />pedestrians? <br />Will we need a permit? If so, what is cost? How long is approval <br />process? <br />2. Material and Material Production <br />A. Material: Large format laminate donated from 3M. (Material will most likely be 480 Non - <br />PVC material). Because this material is Non-pvc, it is a sustainable material. 480 is the <br />newest material designed to hold up on many surfaces. This material is not permanent <br />and considered removable. <br />B. Printer: TBD — printing will be large format printing will be printed in several sheets in <br />order to be installed per unit. <br />3. Surface Testing <br />Work in partnership with the city, 3M and installers to verify surface of each water tower. <br />A. Surface Testing: Installation Company to conduct a site visit. Site visits will include: <br />surface test (adhesion and paint testing). Installation Company to use a sample of the <br />480 material to test adhesion and potential surface preparation (removal of old paint?). <br />City to provide information on the brand/type of paint used, most recent paint date, <br />assumed date of painting water tower again. <br />4. Installation <br />1. Key Dates: See below timeline <br />2. Installation — Hoping for one week. Installation can be slow and will depend on <br />weather. If wind exceeds 10 mph workers will not be able to be on swing stage. <br />3. Materials/equipment: We will use the following for installation (including but not <br />limited to) boom truck, crane, rigging equipment, and swing stage. <br />4. Contractors: 4-6 contractors — will be covered with liability insurance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.