Laserfiche WebLink
Planning & Zoning Board <br />April 8, 2015 <br />Page 4 <br />APPROVED MINUTES <br />original plan. Mr. Laden asked if there is a timeframe for which the landscaping needs to <br />be done. Ms. Larsen said there is not a detailed timeframe. Chair Tralle asked Mr. <br />Hokanson if there is an estimated time for total build out. Mr. Hokanson responded he <br />does not have a specific timeframe but the units should sell quickly. Mr. Hokanson also <br />noted where the staging unit will be located. <br /> <br />Mr. Laden made a MOTION to close the Public Hearing at 7:42 p.m. Motion was <br />supported by Mr. Masonick. Motion carried 4 - 0. (Tralle abstained.) <br /> <br />The board members discussed their concerns and preferences regarding stone/brick <br />columns vs. the white pillars. Ms. Larsen referred to the original plan and found it <br />included a wood support beam. <br /> <br />Mr. Laden made a MOTION to recommend approval of amendment to PUD <br />Development Stage Plan/Preliminary Plat based on the following conditions, which <br />includes two additional recommendations by the board: <br /> <br />1. All comments from City Engineer letter dated March 27, 2015 shall be addressed. <br />2. All comments from Environmental Coordinator letter dated April 3, 2015 shall be <br />addressed. <br />3. All comments from Anoka County Highway Department letter (to be provided) shall <br />be addressed. <br />4. A RCWD permit shall be required. <br />5. Sheet 1, Certificate of Survey: <br />a. There is an existing shared access easement over the north property and the <br />adjacent property. This easement and document # shall be shown. <br />b. Under Zoning and Setbacks, PDO shall be changed to CUP PUD. (This shall <br />be changed on all plan sheets). <br />c. Perimeter (North line) setback shall be changed from 29 feet to 25 feet. (This <br />shall be changed on all plan sheets). <br />d. Under Comprehensive Plan, “full build out” shall be omitted. (This shall be <br />changed on all plan sheets). <br />6. Sheet 2, Impervious Coverage Exhibit: <br />a. The guest parking stalls shall not be removed. <br />b. The guest parking stalls shall be replaced with porous pavers to meet <br />impervious coverage calculations. This shall be noted on the plans. <br />7. Sheet 3, Preliminary Plat: <br />a. The lot and block numbering shall be consistent with the Turnberry Crossing <br />final plat. <br />b. Building setback line along north perimeter shall be revised from 29 feet to 25 <br />feet. <br />c. The detail for the townhomes proposed on Lots 6, 7, 10 and 11 shall also be <br />included. <br />8. Sheet 4, Grading Plan: <br />a. See City Engineer Comments. <br />9. Sheet 5, Landscape/Planting Plan: