Laserfiche WebLink
ATTACHMENT B <br />SUMMARY OF IMPROVEMENT COSTS <br />DEVELOPER INSTALLED IMPROVEMENTS <br />PROJECT NAME: Marshan Meadows Second Addition NUMBER OF REU's: 1 <br />APPLICANT: Albert J. and Sherri A. Shober ASSESSED AREA (ac.): 0.46 <br />BUDGET PRIVATE PUBLIC FEE <br />ITEM NECESSARY IMPROVEMENTS COST NOTE IMP. (W) IMP. (X) AMOUNT (Z) <br />1 SITE GRADING Estimate e $0 $0 <br />2 EROSION CONTROL Estimate e $0 <br />3 SITE ENGINEERING & SURVEYING Estimate e $0 <br />4 LANDSCAPING Estimate e $0 <br />5 STREETS <br />A. Turn Lanes Estimate e $0 <br />B. On Site Parking Lot Estimate e $0 <br />B. Pedestrian Trail Estimate e $0 <br />6 STORM SEWER CONST. <br />A. Trunk Estimate e <br />B. Lateral Estimate e $0 <br />C. Surface Water Mgmt. $0.135/sf a $0 <br />7 SANITARY SEWER CONST. <br />A. Trunk Unit Charge (REU) $2,911/unit a $2,911 <br />B. Lateral Estimate e $0 <br />C. Trunk Credit Estimate e <br />8 WATERMAIN CONST. <br />A. Trunk Unit Charge (REU) $3,854/unit a $3,854 <br />B. Lateral Estimate e $0 <br />C. Trunk Credit Estimate e <br />TOTALS: $0 $0 $6,765 <br />See Attachment C for security amounts to be posted <br />NOTE: <br />a: Cost by City policy <br />b: Estimated Cost or Budget by City <br />c: Previously Assessed <br />d: Cash Requirement per Agreement with Park Board <br />e: Provided by Developer <br />f: Estimate by Feasibility Study <br />