My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2014-048 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2014
>
2014-048 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 10:23:58 AM
Creation date
7/14/2015 2:16:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
06/23/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NorthPointe <br />Development Contract <br />June, 2014 <br />8. The street right-of-way, storm water storage ponds, and surface <br />water drainage ways shall be graded prior to commencement of <br />utility construction. <br />9. Drainage swales, ditches, storm water storage ponds and other high <br />risk erosion areas shall be protected from erosion. <br />10. All grading must be completed prior to issuance of building <br />permits. <br />11. All streets shall be protected' from erosion deposits. This should <br />include a combination ofroadside silt fences, roadside sod strips, <br />catch basin rock bale inlet protection, rock construction entrances, <br />straw mulch, and/or street sweeping. <br />12. The Developer's engineer shall certify, in writing with an as -built <br />survey, that all grading complieswith the approved,grading plan <br />prior to issuance of any building permits. <br />13. The Developer be responsible for ascertaining that site <br />geotechnical and groundwater conditions are adequate and <br />informing with the grading and site improvement as proposed. <br />14. The Developer ovide financial security and/or cash escrow <br />to assure completion of the grading and restoration, in the event <br />that the work is not completed by the Developer. <br />iv. Final street grading, subbase, gravel base, concrete curb and gutter, and <br />bituminous base course and wear course shall be furnished and installed. <br />v. All homeowners association declarations, covenants, and property and <br />legal requirements as required in the Agreement shall be submitted to the <br />City Attorney for review as required by the City's final plat requirements. <br />vi. Storm sewers, when determined to be necessary by the City Engineer, <br />includg all necessary laterals, catch basins, inlets and other <br />appurtenances, shall be furnished and installed. <br />vii. Sanitary sewer mains, laterals or extensions, including all necessary <br />building services and other appurtenances, shall be furnished and installed. <br />viii. Water mains, laterals or extensions, including all necessary building <br />services, hydrants, valves and other appurtenances, shall be furnished and <br />installed. <br />page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.