My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2014-051 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2014
>
2014-051 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 10:21:30 AM
Creation date
7/14/2015 3:00:38 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
06/09/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 27, 2014 <br />Page 2 of 4 <br />• Perform a well interference study of the impact of the combined pumping of Well 3 and 5 and new <br />Well 6 on pumping water levels in the Jordan aquifer <br />• Develop a prolife of the expected bedrock geology at Well 6 <br />• Discuss the need, if determined by geologic review, to drill a pilot or exploratory well <br />2. Prepare Preliminary Design of Well 6 <br />• Ascertain future pumphouse requirements <br />• Consider future water treatment raw water collection routing and sizing <br />• Discuss anticipated geologic profile, proposed well sizing, and preferred construction methods <br />(i.e. cable tool) and acceptable experienced drilling Contractors <br />• Discuss well design alternatives <br />• Locate Well 6 on the site <br />• Review schedule, updates as necessary <br />3. Develop Contract Documents for Bidding <br />:)1Girl ( <br />• Division 1 requirements <br />• General conditions <br />• Minority involvement <br />• Prevailing wage <br />• Prepare preliminary cost estimate for completion of Well 6 <br />Design with community in rnind <br />c,r16trucT o <br />
The URL can be used to link to this page
Your browser does not support the video tag.