Laserfiche WebLink
March 27, 2014 <br />Page 2 of 4 <br />• Perform a well interference study of the impact of the combined pumping of Well 3 and 5 and new <br />Well 6 on pumping water levels in the Jordan aquifer <br />• Develop a prolife of the expected bedrock geology at Well 6 <br />• Discuss the need, if determined by geologic review, to drill a pilot or exploratory well <br />2. Prepare Preliminary Design of Well 6 <br />• Ascertain future pumphouse requirements <br />• Consider future water treatment raw water collection routing and sizing <br />• Discuss anticipated geologic profile, proposed well sizing, and preferred construction methods <br />(i.e. cable tool) and acceptable experienced drilling Contractors <br />• Discuss well design alternatives <br />• Locate Well 6 on the site <br />• Review schedule, updates as necessary <br />3. Develop Contract Documents for Bidding <br />:)1Girl ( <br />• Division 1 requirements <br />• General conditions <br />• Minority involvement <br />• Prevailing wage <br />• Prepare preliminary cost estimate for completion of Well 6 <br />Design with community in rnind <br />c,r16trucT o <br />