Laserfiche WebLink
Tal an Ridge <br />Development Contract <br />September, 2014 <br />c. The wetland buffer areas shall be protected as detailed in the <br />approved plans. <br />d. The Developer shall install four (4) inches of topsoil on all <br />boulevards and seed or sod as approved by the City. <br />e. All disturbed areas shall be restored immediately upon completion <br />of construction. <br />f Drainage swales, ditches, storm water storage ponds and other high <br />risk erosion areas shall be irr tected from erosion. <br />g. All grading must be completed prior to issuance of building <br />permits. <br />h. All streets shall be/protected fro n erosion d its. This should <br />include a combination of roadsilt fences, roadside sod strips, <br />catch • inlet protec i 'uconstruction en tr ces, erosion <br />control E met, mulch, an /street sweeping. <br />i. The Deve <br />ey, that <br />to issua <br />, in writing with an as -built <br />e approved grading plan <br />:,permits. <br />eueloper shad be responsible for ascertaining that site <br />eotechnical and dwater conditions are adequate and <br />Fnforming with the acting and site improvement as proposed. <br />The Developer shall provide financial security and/or cash escrow <br />o assu,mpletion of the construction and restoration, in the <br />ent that „work is not completed by the Developer. <br />er shall place iron monuments at all lot and block corners and <br />gle points on boundary lines. Iron monuments shall be <br />lawn grading has been completed in order to preserve the lot <br />ma 'for future property owners. Lot corner irons on the back property <br />line shall be installed so that the top of the iron corresponds to the finished <br />ground elevation in accordance with the approved grading plan. Guard <br />stakes shall be appropriately installed to mark these irons. <br />iii. The Developer shall promptly clear dirt and debris within public right-of- <br />ways and drainage and utility easements resulting from construction by the <br />Developer, its purchasers, builders and contractors within five (5) days <br />after notification by the City. The Developer or its assigns shall be <br />responsible for all necessary street and storm sewer maintenance, <br />including street sweeping, prior to issuance of any Certificates of <br />page 3 <br />