My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2014-120 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2014
>
2014-120 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 10:14:09 AM
Creation date
7/15/2015 10:00:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
10/13/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bidder: CW I-6 ...,1e, I.►C <br />Address: am IA) Co litam <br />Telephone No.: 4 g 4 --b)1.1 <br />City, State, Zip: S‘evi GW,i 1'1•1%7 j Si Zb <br />►s <br />Fax No.: 484 -SONS <br />REQUEST FOR QUOTES <br />2014 SURFACE WATER MANAGEMENT PROJECT <br />CITY OF LINO LAKES, MINNESOTA <br />WSB PROJECT NO. 2029-72 <br />Opening Time; 12:00 a.m. <br />Opening Date: Friday, September 12, 2014 <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Dear Council Members: <br />1. The following proposal is made for furnishing and installing all labor and materials necessary for the 2014 <br />Surface Water Management Project, for the City of Lino Lakes, Minnesota. <br />2. The undersigned certifies that the Contract Documents listed in the Instructions to Bidders have been <br />carefully examined, and that the site of the work has been personally inspected. The undersigned declares that <br />the amount and nature of the work to be done is understood, and that at no time will misunderstanding of the <br />Contract Documents be pleaded. On the basis of the Contract Documents, the undersigned proposes to furnish <br />all necessary apparatus and other means of construction, to do all the work and furnish all the materials in the <br />manner specified, and to accept as full compensation therefore the sura of the various products obtained by <br />multiplying each unit price herein bid for the work or materials, by quantities thereof actually incorporated in the <br />completed project, as determined by the Engineer. The undersigned understands that the quantities mentioned <br />herein are approximate only, and are subject to increase or decrease, and hereby proposes to perforin all work as <br />either increased or decreased, in accordance with the provisions of the specification, at the unit prices bid in the <br />following proposal schedule, unless such schedule designates lump sump bids. <br />3. PROPOSED SCHEDULE: The Bidder agrees to perform all work described in the specifications and shown <br />on the plans for the following unit prices: <br />Page 1 <br />K:102929.720•A dmtrASpea t <br />7. Proposal Form Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.