Laserfiche WebLink
12. Page 7-22 — Table 7-9: Capacity Analysis — Existing Sewer System — District 1 has been <br />modified as follows: <br />Facility <br />Name/Location <br />Service <br />Area (Sub- <br />Districts) <br />Future Flow <br />Existing <br />Capacity <br />(MGD) <br />Remarks <br />Avg. <br />(MGD) <br />Peak <br />Factor <br />Peak <br />(MGD) <br />Lift Station #5 <br />(Pumps to LS <br />1) <br />1F <br />0.214 <br />3.800 <br />0.813 <br />0.432 <br />May <br />Require <br />Upgrade, <br />See Note 2 <br />Lift Station #1 <br />1D, 1F, & <br />1 G <br />0.495 <br />3.400 <br />1.683 <br />1.267 <br />May <br />Require <br />Upgrade, <br />See Note 2 <br />12" Trunk <br />Sewer, <br />Country Lakes <br />Drive <br />1D, 1F, 1G <br />& about 70 <br />homes in <br />1B <br />0.514 <br />3.400 <br />1.748 <br />1.080 <br />May <br />Require <br />Upgrade, <br />See Note 2 <br />21" Trunk <br />Sewer at Lift <br />Station L69 <br />1B, 1D, <br />1F, 1G, & <br />1H <br />0.937 <br />3.200 <br />2.998 <br />3.240 <br />Adequate <br />Capacity <br />MCES Lift <br />Station L69 <br />All of <br />District 1 <br />1.326 <br />3.000 <br />3.978 <br />3.970 <br />At <br />Capacity; <br />See Note 2 <br />13. Page 7-24 — Existing Sanitary Sewer System Capacity Analysis: Sewer District 1, first <br />paragraph, second sentence has been revised to the following: <br />a. The current capacity of Lift Station L69 is 3.97 MGD which is equal to the <br />projected ultimate flow of 3.97 MGD. <br />14. Page 7-25 — Existing Sanitary Sewer System Capacity Analysis: Sewer District 4, first <br />paragraph, sixth sentence has been revised to the following: <br />a. The capacity available to Lino Lakes in the White Bear Township sewer is <br />approximately 2.33 MGD, which exceeds the projected ultimate flow of 1.512 <br />MGD from District 4. <br />15. Page 7-30 — Figure 7-5: Future Sanitary Sewer System with Utility Staging Map has been <br />modified to show the identified parcels from Planned Service Area (Post 2030) to <br />Planned Service Area (2010-2020). <br />16. Page 7-31 — Figure 7-6: Future Trunk Sanitary Sewer System has been modified to show <br />the identified parcels from Sanitary Sewer District 4B to 1F. <br />BE IT FURTHER RESOLVED, the adoption of the amendments to the City's Comprehensive <br />Plan is subject to review and approval by the Metropolitan Council. <br />Adopted by the Council of the City of Lino Lakes this 10th day of November, 2014. <br />4 <br />