My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-11-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
05-11-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 12:50:55 PM
Creation date
7/15/2015 12:21:14 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/11/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF ORIGINATOR: <br />MEETING DATE: <br />TOPIC: <br />VOTE REQUIRED: <br />INTRODUCTION <br />CITY COUNCIL <br />AGENDA ITEM 6B <br />Diane Hankee, City Engineer <br />May 11,2015 <br />Consider Resolution No. 15-48 Order Project, Approving the <br />Plans & Specifications, Authorizing the Ad for Bid, 2015 Mill <br />and Overlay Project <br />3/5 Vote Required <br />Staff is requesting Council order project, approve of plans and specifications and authorizing <br />advertisement for bids for the 2015 Mill and Overlay Project. <br />BACKGROUND <br />In accordance with the City's Pavement Management Policy, streets are analyzed and projects <br />selected annual. This program provides critical maintenance of the City's roadway system. The <br />2015 project includes the West Oaks, Otter Bay and Otter Lake Hills neighborhoods along with <br />Bald Eagle Lake Boulevard and County Road J. A full depth reclamation and mill and overlay <br />will be completed as detailed in the attachment. Rolled bituminous curb will be replaced and <br />existing drainage patterns maintained. <br />A neighborhood meeting was held on April 28, 2014 to review the level of project, scope, and <br />construction expectations. There were residents concerned about the expiration of their septic <br />systems and commented that the City should extend utilities. They noted that Hugo and White <br />Bear Township have been doing so. Attached is the meeting presentation. The project plans in <br />specifications have been prepared and are on file at the City. <br />The maintenance budget for 2015 is $514,500. Due to project savings on previous pavement <br />management programs the 2015 project is encompassing a larger area than we typically are able to <br />complete. We have an overall project budget of $850,000 and will award the project alternates <br />based on the budget. The alternates are detailed in the attachment. <br />The schedule for this project is as follows: <br />City Council Authorizes Plans and Specifications <br />Neighborhood Meeting <br />City Council Approves Plans and Specifications <br />City Council Authorizes Ad for Bids <br />City Open Bids <br />City Council Awards Contract <br />Construction Begins <br />February 23, 2015 <br />April 28, 2015 <br />May 11,2015 <br />May 11, 2015 <br />June 10, 2015 <br />June 22, 2015 <br />June 29, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.