My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2011-009 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2011
>
2011-009 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 11:49:40 AM
Creation date
7/16/2015 10:13:43 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
03/28/2011
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) Better Site Design principles will be incorporated and water quantity <br />BMPs (as defined in this ordinance) must be incorporated to the following standards: <br />1. BMP volume must retain the one-year event by providing at least the <br />volume equal to the runoff from a 2.3 -inch, 24-hour storm over the tributary area within <br />the site under proposed conditions. <br />a. Infiltration BMPs (see City BMP standard plates and design <br />criteria) are to be incorporated in areas with A & B hydrologic soil groups. Stormwater <br />from impervious surfaces other than rooftops must be pretreated before discharge to <br />infiltration BMPs, to remove sediment and floatables, or other materials that would <br />restrict the BMP's capacity or contaminate ground water. <br />b. In the following areas, the volume requirements shall be provided <br />by bio -filtration features or two -cell wetland treatment systems (see City standard plates <br />and design standards): <br />(i) Areas of C or D hydrologic soil groups that cannot be routed by a <br />gravity system to onsite A or B hydrologic soil groups; Areas with a groundwater table <br />within three (3) feet of surface, or otherwise at an elevation that poses a threat of <br />groundwater contamination or renders the infiltration BMP ineffective; <br />(ii) Areas where soil contamination is present or land use history <br />indicates a likely threat of soil contamination. <br />(c) In addition to the BMPs required under (6)(b), volume control measures <br />are required reducing runoff by at least the volume from 0.5 -inches of rainfall over <br />impervious surfaces on the site (0.5 -inch multiplied by impervious area). Volume <br />reduction required under this paragraph may be achieved only by the following measures: <br />Reestablishment of Effectively Drained Wetlands and Floodplain Meadows Upland <br />Restoration/Conservation, Restoration of Degraded Wetlands, Impervious Disconnection, <br />Soil Amendments/Tilling. <br />Volume Reduction Measures <br />Volume Calculation <br />Reestablishment of Effectively <br />Drained Wetlands and Floodplain <br />Meadows <br />1.0" x surface area (ac) for <br />floodplain meadows and seasonally <br />flooded, scrub shrub, and forested <br />wetlands <br />0.5" x surface area (ac) for fully <br />vegetated Type 2 and 3 wetlands <br />Upland <br />Restoration/Conservation <br />0.85" x surface area (ac) <br />Restoration of Degraded Wetlands <br />0.25" x surface area (ac) <br />Impervious Disconnection <br />Up to 0.5" x disconnected <br />
The URL can be used to link to this page
Your browser does not support the video tag.