My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2011-009 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2011
>
2011-009 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 11:49:40 AM
Creation date
7/16/2015 10:13:43 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
03/28/2011
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
thereafter. Private facilities are subject to City inspection at any time to ensure <br />. <br />compliance. <br />(b) Public Stormwater Facilities <br />1. Acceptance of Publicly Owned Facilities Before work under the permit is <br />deemed complete, as-builts and certification must be submitted demonstrating at the time <br />of final stabilization that the stormwater facilities conform to design specifications. A <br />final inspection shall be required before the City accepts ownership of the stormwater <br />facilities. <br />2. Inventory of Stormwater Facilities. The City shall inventory and maintain <br />a database for all public stormwater facilities within the City requiring maintenance to <br />ensure compliance with this ordinance. <br />3. Maintenance. The City shall perform maintenance of publicly owned <br />stormwater facilities within the City as provided for in the local surface water <br />management plan. <br />1011.11 PLAN REVIEW PROCEDURE <br />(1) Plan Review. The applicant shall not commence any construction activity subject <br />to this ordinance until the Stormwater Management plan and/or the Grading, Erosion and <br />Sediment Control plan have been approved by the City. The submittal shall be <br />processed in accordance with Section 2 of the Zoning Ordinance or Section 1011.00 of <br />City Code as applicable. City approval is contingent on issuance of all other permits <br />required by the City or other agencies having jurisdiction on the project. The following <br />standards shall apply to all developments within the City: <br />(2) Plan Approval. If the City determines that the stormwater management plan <br />and/or the Grading, Erosion and Sediment Control plan meets the requirements of this <br />ordinance, the City shall issue a plan approval valid for a specified period of time that <br />authorizes the land disturbance activity contingent on the implementation and completion <br />of this plan. <br />(3) Plan Denial. If the City determines that the plan does not meet the requirements <br />of this ordinance, the City shall not issue plan approval for the land disturbance activity. <br />This plan must be resubmitted for approval before the land disturbance activity begins. <br />All land use and building permits shall be suspended until the developer has an approved <br />ESC or Stormwater Management permit. <br />(4) Modification of Plan. The applicant must amend the plan as necessary to include <br />additional requirements such as additional or modified BMPs designed to correct <br />problems identified or address situations whenever: <br />
The URL can be used to link to this page
Your browser does not support the video tag.