My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2011-022 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2011
>
2011-022 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 11:47:17 AM
Creation date
7/16/2015 10:35:09 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
12/12/2011
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor License <br />SAC (Sewer Availability Charge) <br />3/" Water Meter <br />1" Water Meter <br />MXU Unit <br />$50.00 <br />Per Met Council <br />City cost plus 10% handling fee and sales tax <br />City cost plus 10% handling fee and sales tax <br />City cost plus 10% handling fee and sales tax <br />Touch Pad <br />Curb Stop Covers <br />Septic Installation or Repair Permit <br />Septic Pumping Permit <br />Demolition Permit <br />Lawn Sprinkler/Irrigation System Permit (effective June 26, 2008) <br />Irrigating or Watering of New Landscaping Permit (sod or seed) <br />Lawn Sprinkling Violation <br />$18.00 plus sales tax <br />$70.00 plus sales tax <br />$150.00 <br />$5.00 <br />$50.00 <br />$50.00 <br />No Charge <br />$25.00 for first violation <br />$50.00 for each subsequent citation <br />Driveway Replacement Permit $50.00 <br />Fee Refund — Per applicant request, City staff may refund permit fees up to 80% for voided permits. <br />Plan review fees and state surcharge fees are non-refundable. No refund shall be provided if permit has <br />expired. <br />All permits issued are subject to applicable State surcharge fees. <br />* Inspections made out side of normal business hours is a three-hour minimum charge <br />** Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, <br />overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />* * * Actual costs include administrative and overhead costs. <br />Sign Permit -Temporary (portable/banner) <br />Sandwich Board <br />$25.00/Term <br />$25.00 <br />An escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for <br />plan revision and construction observation. <br />ESCROW DEPOSITS <br />In order to obtain a Certificate of Occupancy, escrow deposits shall be collected if exterior work <br />cannot be completed due to inclement weather, as determined by City Staff, whereupon a Temporary <br />Certificate of Occupancy would be issued subject to the execution of an escrow agreement and <br />payment thereof. Any unfinished work must be completed within six months (weather permitting) <br />from the date of issuance. The following escrow amounts are hereby established: <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.