Laserfiche WebLink
7. Watermains/Hydrants/Sanitary Sewers $62,000.00 <br /> 8. Landscaping $35,000.00 <br /> 9. Site Grading $75,000.00 <br /> 10. Erosion Control $9,500.00 <br /> Total Estimated Cost of Developer $323,600.00 <br /> Improvements <br /> Security Requirement(Total * 125%) $404,500.00 <br /> III. OFF-SITE WORK <br /> A. Right-of-Way. The Developer shall be responsible for acquiring any <br /> right-of-way, temporary easements, or permanent easements necessary for <br /> the making of such improvements. <br /> B. Plans& Specifications. The Developer shall prepare plans and <br /> specifications for the making of such improvements. Said plans and <br /> specifications shall be subject to review and approval by the City of Lino <br /> Lakes and Anoka County. <br /> C. Construction Observation. The Developer shall instruct its engineer to <br /> provide adequate field inspection personnel to assure an acceptable level <br /> of quality control to the extent that the Developer's engineer will be able to <br /> certify that the construction work meets the approved City and County <br /> standards as a condition of City/County acceptance. In addition, the City <br /> and/or County shall have one or more inspectors inspect the work on a full <br /> or part-time basis. <br /> The Developer,its contractors and subcontractors, shall follow all <br /> reasonable instructions received from the City's/County inspectors.Prior <br /> to construction, the Developer or its engineer shall schedule a <br /> preconstruction meeting at a mutually agreeable time at the Lino Lakes <br /> City Hall,located at 600 Town Center Parkway,Lino Lakes,Minnesota <br /> with contractors, subcontractors, the City staff, and other parties specified <br /> by the City to review the program for the construction work. <br /> D. Record Plans. Within thirty(30)days after the completion of the <br /> improvements the Developer shall supply the City with a complete set of <br /> reproducible mylar"Record"drawings,and two complete sets of paper <br /> copy"Record" drawings,all prepared in accordance with City standards. <br /> An electronic copy of the plans shall also be submitted in an AutoCAD <br /> DWG format. <br /> E. As-Built Survey. The Developer's engineer shall certify,in writing with <br /> an as-built survey, that all grading complies with the grading plan prior to <br /> SMWFCU Performance AgreemenLdoc page 3 of 9 <br />