Laserfiche WebLink
Grandview <br />Development Contract <br />October 22, 2007 <br />5. Sanitary sewer mains, laterals or extensions, including all necessary building <br />services and other appurtenances shall be furnished and installed. All <br />connections to existing City facilities shall be performed by the Developer, <br />but only upon approval and authorization of the City of Lino Lakes at least <br />48 hours prior to making actual connection. <br />6. Water mains, laterals or extensions, including all necessary building <br />services, hydrants, valves and other appurtenances shall be furnished and <br />installed. All connections to existing City facilities shall be performed by <br />the Developer, but only upon approval and authorization of the City of Lino <br />Lakes at least 48 hours prior to making actual connection. <br />7. The Developer shall place iron monuments at all lot and block corners and at <br />all other angle points on boundary lines. Iron monuments shall be placed <br />after all street and lawn grading has been completed in order to preserve the <br />lot markers for future property owners. Lot comer irons on the back <br />property line shall be installed so that the top of the iron corresponds to the <br />finished ground elevation in accordance with the approved grading plan - <br />guard stakes shall be appropriately installed to mark these irons. <br />8. The Developer shall promptly clear dirt and debris, within public right-of- <br />ways, and drainage and utility easements, resulting from construction by <br />the Developer, its purchasers, builders and contractors within five (5) days <br />after notification by the City. The Developer or its assigns shall be <br />responsible for all necessary street and storm sewer maintenance including <br />street sweeping, and storm sewer resulting from the accumulation of said <br />dirt and debris, prior to issuance of any Certificates of Occupancy. <br />Warning signs shall be placed when hazards develop in streets to prevent the <br />public from traveling on same and directing attention to detours. If and <br />when the streets become impassable, such streets shall be barricaded and <br />closed. The Developer shall maintain a smooth, hard driving surface and <br />adequate drainage on all temporary streets. <br />9. The Developer shall dedicate to the City, prior to approval of the final plat, <br />at no cost to the City, any permanent or temporary easements that may be <br />necessary for the construction and installation of the Developer <br />Improvements. All such easements required by the City shall be in writing, <br />in recordable form, containing such terms and conditions as the City shall <br />determine. <br />10. The Developer shall be responsible for securing all site grading and <br />development approvals and permits from all appropriate Federal, State, <br />Regional and Local jurisdictions prior to the commencement of site grading <br />or construction and prior to the City awarding construction contracts for <br />public utilities. As previously stated, the Developer shall attain an NPDES <br />page 4 <br />