My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2007-016 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2007
>
2007-016 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 2:30:29 PM
Creation date
7/16/2015 1:57:28 PM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
12/10/2007
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23. Water Connection Fee $250.00 <br />24. Contractor License Verification $5.00 per permit <br />�-' 25. Contractor License .$50.00 <br />26. SAC (Sewer Availability Charge) per Met Council <br />27. 3/" Water Meter $165.00 <br />28. 1" Water Meter $325.00 <br />29. MXU Unit $125.00 <br />30. Septic Installation or Repair Permit $150.00 <br />31. Septic Pumping Permit $5.00 <br />32. Demolition Permit $17.00 $50 OI1 <br />Fee Refund — Per applicant request, City staff may refund permit fees up to 80% for voided permits. Plan <br />review fees and state surcharge fees are non-refundable. <br />All permits issued are subject to applicable State surcharge fees. <br />* Inspections made out side of normal business hours is a three-hour minimum charge <br />** Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, <br />overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />* * * Actual costs include administrative and overhead costs. <br />Sign Permit -Temporary (portable/banner) $25.00/Term <br />Sandwich Board 25 001 <br />Touch Pad ..$20.00 <br />Curb Stop Covers $68.00 <br />An escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan <br />revision and construction observation. <br />ESCROW DEPOSITS <br />In order to obtain a Certificate of Occupancy, escrow deposits shall be collected if exterior work cannot be <br />completed due to inclement weather, as determined by City Staff, whereupon a Temporary Certificate of <br />Occupancy would be issued subject to the execution of an escrow agreement and payment thereof. Any <br />unfinished work must be completed within six months (weather permitting) from the date of issuance. The <br />following escrow amounts are hereby established: <br />a. Driveway -$1,000.00 <br />b. Exterior Concrete - $1,000.00 <br />c. As -built Surveys - $1,000.00 <br />d. Stucco (final coat only) - $1,000.00 <br />e. Garage Floor - $1,000.00 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.