My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2005-012 Council Oridinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2005
>
2005-012 Council Oridinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 1:31:55 PM
Creation date
7/17/2015 9:26:29 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
11/28/2005
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. In instances where two (2) or more permits are issued for a residential structure, the plan review fee shall <br />be forty percent (40%) per dwelling unit. <br />12. Escrow Fees <br />At the time of the final certificate of occupancy if the following items are not completed, an escrow in the <br />amount indicated will be taken. There are two options for entering into an escrow agreement with the City. <br />The escrow can be paid to the City and an agreement filled out and signed by the payee and City Official, or <br />the title company or lending institution can hold the escrow and fill out an agreement form stating they are the <br />responsible party for holding the funds for the uncompleted items. <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />g• <br />Driveway - $1,000.00 <br />Exterior Concrete - $1,000.00 <br />Landscaping - $2,500.00 <br />As -built Surveys - $1,000.00 <br />Stucco (final coat only) - $1,000.00 <br />Garage Floor - $1,000.00 <br />There will be a $50.00 non-refundable administrative fee for escrow deposits <br />The only time these items can be uncompleted is during the winter months, except landscaping. A temporary <br />certificate of occupancy shall be issued and unfinished work must be completed within six (6) months <br />(weather permitting) after entering into the escrow agreement. <br />13. Easement Encroachment Fee $30.00 <br />14. Fence Permit $47.00 <br />15. Sign Permit Fee Table <br />16. All Residential Mechanical Permits, (except new construction and air conditioning $25.00 <br />17. Residential New Construction Mechanical Permit $60.00 <br />18. Residential Air Conditioning Permit <br />19. Commercial Mechanical Permit <br />20. Manufactured Home Permits <br />21. Plumbing Permit <br />22. Sewer Connection Fee <br />23. Water Connection Fee <br />1% of the contract price ($25.00 minimum fee) <br />1% of the contract price ($25.00 minimum fee) <br />$90.00 <br />$9.00 per fixture ($15.00 minimum fee) <br />$200.00 <br />$250.00 <br />$5.00 per permit <br />$50.00 <br />per Met Council <br />$290.00 <br />$325.00 <br />24. Contractor License Verification <br />25. Contractor License <br />26. SAC (Sewer Availability Charge) <br />27. 3/4" Water Meter <br />28. 1" Water Meter <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.