Laserfiche WebLink
1. from furthest HFC I -Net Site to furthest HFC I -Net Site related to the <br />performance of interactive video and data -over -cable communications; <br />and <br />2. from the furthest HFC I -Net Site to the longest subscriber cascade. <br />All testing performed hereunder shall use carriers that are representative of those <br />on the I -Net. If this subjects the I -Net to service interruptions, the Grantee shall <br />work with I -Net Users to minimize the impact of such interruptions. Testing shall <br />be completed at the mutually agreed upon entry demarcation point at the HFC I - <br />Net Site. The I -Net shall meet all the standards set forth herein under full loading <br />and any combination of analog video, audio, and digital channels. <br />II. Dark Fiber Optic Infrastructure (DFOI) <br />Optical Cabling Characteristics — Maximum loss shall not exceed manufacturer's passive <br />attenuation, adjusted for cable length, splice loss and connector loss. Typical cable <br />attenuation at 1550 nm shall be less than or equal to .25 dB per kilometer. Typical cable <br />attenuation at 1310 nm shall be less than or equal to .35 dB per kilometer. Typical splice <br />loss shall be less than or equal to .2 dB. Maximum connector pair loss shall be less than <br />or equal to .75 dB. Where the loss characteristics of any link exceed the typical <br />parameters described herein, and Dark Fiber Infrastructure Users and any Additional <br />DFOI Users cannot successfully transmit video, voice and data communications across <br />the DFOI link using equipment consistent with accepted industry standards, then the <br />Grantee shall make necessary adjustments in the DFOI link such that it will enable <br />successful operation for the Dark Fiber Infrastructure User and/or Additional DFOI User. <br />III. Network Availability <br />A. I -Net and DFOI network availability shall be equal to or better than 99.965%, as <br />measured on an annual basis for the entire I -Net and for the DFOI. <br />Notwithstanding the foregoing, once any individual site falls below a network <br />availability of 99.9% (no more than 530 minutes of network downtime per site), <br />the Grantee shall take immediate action to determine whether an inherent or <br />chronic system problem is affecting that site. If such a problem is identified, the <br />Grantee shall work continuously to resolve the problem, so that such site achieves <br />the best -case network availability as measured for any other I -Net or DFOI site. <br />B. The I -Net and the DFOI shall be defined as "unavailable" under the standards <br />herein when a user: <br />1. cannot, because of a Grantee network component problem, transmit video, <br />voice and/or data communications to, from and/or on the network; and/or <br />B-2 <br />