My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2003-004 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2003
>
2003-004 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2015 10:02:00 AM
Creation date
7/20/2015 8:09:51 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
02/24/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. The extension of water mains will provide adequate water pressure for <br />personal use and fire protection. <br />d. Rural subdivision can demonstrate that each of the proposed lots can be <br />provided with a potable water supply. <br />5. Waste Disposal Systems. A proposed subdivision shall be served with adequate <br />waste disposal systems when: <br />a. The urban sewered subdivision is located inside the City's MUSA or is <br />consistent with the MUSA allocation criteria. <br />b. The City has sufficient MUSA and pipe capacity to serve the subdivision if <br />developed to its maximum density. <br />c. The subdivision will result in a sewer extension consistent with Lino Lakes <br />Sewer Plan and Capital Improvement Plan. <br />d. A rural subdivision can demonstrate that each lot can be served by an <br />adequate sanitary sewer disposal system. <br />e. A rural subdivision with a proposed communal sanitary sewer or water <br />system has an effective long range management and maintenance program <br />with proper financing. <br />1002-7 MUSA ALLOCATION <br />1002-7-1 MUSA Availability and Commitment <br />The City shall determine MUSA availability as part of the review of a submitted preliminary <br />plat/phasing plan. City approval of the plan shall constitute a commitment by the City to allocate <br />MUSA at the time of final plat approval according to the phasing plan. The criteria in Section 1002- <br />7-2 shall be considered in the review of the preliminary plat/phasing plan. <br />1002-7-2 MUSA Allocation Criteria <br />The following criteria shall be considered to determine if MUSA will be allocated to a preliminary <br />plat/phasing plan: <br />1. A finding is made that the development of the property is not premature. <br />1002. 5 <br />Lino Lakes <br />Subdivision Ordinance General Provisions <br />
The URL can be used to link to this page
Your browser does not support the video tag.