My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2003-004 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2003
>
2003-004 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2015 10:02:00 AM
Creation date
7/20/2015 8:09:51 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
02/24/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Drainage. The natural drainage shall be used as far as is feasible for the storage and <br />flow of runoff. The design of a drainage system shall conform to any overall storm <br />water drainage plan for the area. The following requirements shall also apply: <br />a. Storm water drainage shall be consistent with policies and standards of the <br />Lino Lakes Local Water Management Plan, as may be amended. <br />b. No existing ditch, stream, drain or drainage channel shall be deepened, <br />widened, re-routed or filled without written permission from the City and <br />other governmental agencies. <br />c. Where drainage channels must be constructed to augment the natural drainage <br />system, such channels, as well as the natural drainageways, may be planned <br />as a part of a recreational trail system. When this is done, channels shall be <br />designed to be aesthetically compatible for recreational trail use. <br />2. Either Rice Creek Watershed or VLAWMO shall approve all subdivision grading, <br />drainage, and wetland mitigation plans. <br />1007-9 PUBLIC UTILITIES <br />Telephone, electric, cable, gas service lines and/or other public utilities are to be placed underground <br />in accordance with City standards. <br />1. Developers shall apply for City permits to install underground utilities in public <br />rights-of-way. <br />2. The City shall approve all utilities prior to installation. <br />3. Public utilities shall be installed in a joint trench in accordance with City standards. <br />4. Conduit shall be installed for all road crossings. <br />5. Public utility installation shall not occur until one (1) week after all curb has been <br />backfilled. <br />1007.10 <br />Lino Lakes <br />Subdivision Ordinance Design Standards <br />
The URL can be used to link to this page
Your browser does not support the video tag.