My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2014-065 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2014
>
2014-065 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2015 11:01:59 AM
Creation date
7/27/2015 10:08:08 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
06/23/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />which street reconstruction bonds are anticipated to be issued are marked <br />with an asterisk in Appendix A and are currently anticipated to include the <br />following: <br />2015 Street Reconstruction Bond Financed Expenditures — <br />The 2015 Street Reconstruction Project includes the reconstruction of the following <br />streets; Hokah Drive, Rice Court, Totem Trail, Arrowhead Drive, Tomahawk Trail, <br />Tomahawk Court, Chippewa Trail, and Arrowhead Court, by replacement of curb and <br />gutter as needed, required upgrades of the existing stormwater management system <br />and bituminous surfacing <br />General obligation street reconstruction bonds are proposed to be issued in 2015 in an <br />aggregate principal amount of approximately $3,150,000 for the costs of the <br />Shenandoah Area Improvements and the costs of issuing the bonds. Such bonds may <br />be combined with other financing tools, including general obligation improvement <br />bonds, to finance other capital improvements in the City. <br />Street reconstruction bonds are included in the amount of indebtedness of the City <br />which cannot, under Minnesota Statutes, Section 475.53, exceed 3% of the assessor's <br />taxable market value for the City ("TMV"). The proposed bonds will not exceed <br />statutory limits. <br />All other foreseeable capital expenditures are expected to be financed through other <br />revenue or financing sources. <br />2019 Street Reconstruction Project <br />The 2019 Street Reconstruction Project includes the reconstruction of the following <br />streets; West Shadow Lake Drive, Sandpiper Drive, Shadow Court, LaMotte Drive, and <br />LaMotte Circle which may include required upgrades of existing stormwater <br />management system and bituminous surfacing. <br />No bonds are being contemplated for this project at the present time. <br />Draft Draft 6/13/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.