My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2015-029 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2015
>
2015-029 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2015 1:58:57 PM
Creation date
7/27/2015 1:15:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
03/23/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />CITY COUNCIL <br />AGENDA ITEM 6A <br />STAFF ORIGINATOR: Michael Grochala <br />MEETING DATE: March 23, 2015. <br />TOPIC: Consider Resolution No. 15-29, Authorizing <br />Preparation of Plans and Specifications, Aqua Lane <br />Trunk Water Main Improvements <br />VOTE REQUIRED: Simple Majority <br />INTRODUCTION <br />Staff is requesting council authorization to prepare plans and specifications for the Aqua Lane <br />Trunk Water Main Improvements <br />BACKGROUND <br />The 2030 Comprehensive Plan identifies trunk water main improvements to strengthen the City's <br />municipal water system. The proposed Aqua Lane Trunk Water Main project will extend the <br />existing trunk water main along Aqua Lane and connect with water main extended north of <br />Black Duck Drive. This project is a critical component of our system that completes a major <br />loop and provides redundancy between Tower No. 1 and the well fields located in the southern <br />part of the city. This connection is currently served solely by an existing trunk line along <br />Hodgson Road. <br />The City Engineer, WSB and Associates, has submitted a proposal to provide final design and <br />bidding services for the proposed improvements in the amount of $49,350.00. The estimated <br />construction cost of the project is $1,030,000. The project will be funded though the Trunk Area <br />and Unit Fund. <br />RECOMMENDATION <br />Staff is recommending approval of Resolution No. 15-29 authorizing preparation of plans and <br />specifications. <br />ATTACHMENTS <br />1. Resolution No. 15-29 <br />2. Project Location Map <br />3. WSB Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.