My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2015-063 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2015
>
2015-063 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2015 3:50:47 PM
Creation date
7/28/2015 8:55:13 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
06/08/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />WSB <br />Amminiik` engineering• planning° environmental. construction <br />June 1, 2015 <br />Mr. Michael Grochala <br />Community Development Director <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes. MN 55014 <br />Re: Request for Proposal to Engineering Design Services <br />for the Birch Street By -Pass Lane Construction at Old Birch Street <br />City of Lino Lakes, MN <br />WSB Project No. 2029-632 <br />Dear Mr. Grochala: <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />WSB & Associates, Inc. is pleased to present to you this proposal for professional engineering design <br />services for the Birch Street By -Pass Lane Construction associated with the Saddle Club <br />Development and improvements to Old Birch Street. This project has been coordinated with the <br />Saddle Club Developer and the Anoka County Highway Department. The agreement is that the <br />Developer will fund the design the by-pass lane and the City will complete the design. The County <br />will fund and construct the by-pass lane on Birch Street at the intersection of Old Birch Street (west <br />end). <br />Our design services scope of work includes the following tasks: <br />• Topographic Survey and Data Collection <br />• Project Management and Coordination <br />• Design By-pass lane typical section, Horizontal and Vertical Alignment <br />• Develop Construction plans including Erosion control SWPPP <br />• Proposal Form and Cost Estimate <br />The engineering fee to complete the design of the Birch Street By -Pass Lane Construction is as <br />follows: <br />Topo and Data $ 1,000 <br />Project Management $ 1,000 <br />Design $ 3,200 <br />Construction Plans $ 3,500 <br />Proposal Form and Cost Estimate $ 1,000 <br />Total Fee $ 9,700 <br />The proposed fee is a not to exceed fee. If the scope of services changes we will work with the City <br />to address the changes. Geotechnical services are not included in this proposal and are not anticipated <br />Equal Opportunity Employer <br />wsbeng.com <br />S:'Community De ,lop menr P5,Planning CasesSnddle CAO, .tiin[iReports .20150608 CC Birch Street Nsl'a., Dr,',, Senices DESIGN PROPOSAJ.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.