Laserfiche WebLink
Birch Street Commercial Review Page 3 July 24, 2003 <br />City of Lino Lakes; Minnesota <br />• <br />Preliminary Plat <br />• <br />• <br />Standard drainage and utility easements (5- and 10 -foot widths) shall be provided along all property lines. <br />Drainage and wetland easements shall also be provided to cover all wetland and ponding areas as proposed. <br />All easements shall be platted (shown on the preliminary and final plats). <br />Grading, Drainage, and Erosion Control Plan and Drainage Calculations <br />1. The proposed Plans will require the review and approval of the Rice Creek Watershed District <br />(RCWD), and the Developer shall submit a permit application accordingly. A copy of the permit <br />application (including a wetland delineation report and drainage calculations) must be provided to the <br />City of Lino Lakes. Drainage calculations were provided in January 2003. However, revised drainage <br />calculations with drainage maps must be provided. <br />2. According to the City's Comprehensive Drainage Plan, the site area falls into two sub -watershed <br />areas, Rice Lake SW and Baldwin Lake East. The proposed ponding and discharge locations as <br />shown on the Grading Plan generally appear to be in conformance with the Comprehensive Plan, <br />with the exception of Pond B on the northwest part of the site. Pond B is shown discharging north <br />across Birch Street (to Rice Lake) whereas the Plan suggests that it should discharge west (across <br />Hodgson Road) to Baldwin Lake. This issue should also be addressed with the Rice Creek Watershed <br />District as part of their review. If stormwater drainage is intended to be carried north across Birch <br />Street, accommodations for the drainage between Birch Street and Rice Lake must be reviewed <br />further. <br />3. The Grading Plan (Sheet Gl) must provide additional information prior to construction. Construction <br />notes, typical of grading plans must be provided. These notes would include a legend, provisions for <br />erosion and sedimentation control, provisions for private utilities, references to traffic control and <br />safety requirements (MUTCD), provisions for sweeping and dust control, working hours, and other <br />pertinent information required for construction purposes. <br />Some additional grading and drainage related comments for use in revising the Plans are as follows: <br />• Any imported topsoil, fill material, or granular materials to be used as roadway or building <br />pad fill must be approved by the City Engineer (material and source). <br />• Any notes regarding clearing of trees should be revised to include language stating that <br />clearing and grubbing shall be performed in accordance with the requirements of Mn/DOT <br />2101. <br />• Notes regarding seeding, mulching and turf establishment should refer to the appropriate <br />Mn/DOT Specification for turf establishment (2575) and for the seed mixture specified <br />(3876), or City of Lino Lakes seed specifications as appropriate. <br />