Laserfiche WebLink
• <br />ENGINEERS • ARCHITECTS • PLANNERS <br />BIDS OPENED: OCTOBER 2, 2003, AT 10:00 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />CCS CONTRACTING BIDDER BIDDER <br />ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />69 <br />EA <br />EA <br />EA, <br />sA <br />IEA <br />EA <br />EA <br />69 <br />EA <br />69 <br />ER <br />EA <br />69 <br />69 <br />EA <br />EA <br />Ef) <br />tf) <br />1 $ 4,000.00 1 <br />00 <br />0 <br />O <br />O <br />6 <br />N <br />EA <br />0 0 <br />0 <br />O <br />c <br />N <br />EA <br />$ 5,000.00 <br />�$ 21,150.00 1 <br />o <br />EC) <br />N <br />Eft <br />$ 80,650.00 <br />$ 1,625.00 <br />$ 1,440.00 <br />$ 2,040.00 <br />$ 2,040.00 <br />0 <br />ao <br />EA <br />00 <br />ri <br />.1- <br />h <br />EA <br />$ 87,843.00 <br />$ 4,000.00 <br />0 <br />O <br />O <br />O <br />O <br />EA <br />0 <br />O <br />O <br />O <br />aC) <br />N <br />EA <br />0 <br />O <br />O <br />O <br />(C) <br />iA <br />$ 21,150.00 <br />0 <br />O <br />O <br />u) <br />N <br />fA <br />0 <br />M <br />EA <br />$ 18.00 <br />$120.00 <br />$ 120.00 <br />0 <br />O <br />69 <br />LS <br />LS <br />J <br />LS 1 <br />LS <br />CY <br />TN <br />TN 1 <br />h <br />0 <br />4- <br />CV <br />Q <br />4-,- <br />� <br />125 <br />O <br />CO <br />LIFT STATION <br />MOBILIZATION <br />SUBMERSIBLE PUMPS <br />CONTROL PANEL <br />LIFT STATION COVER, HARDWARE, AND DROP PIPE <br />10 DIP, CL 52 STATION PIPING, VALVES, AND FITTINGS <br />PAINTING <br />SUBTOTAL DIVISION I - <br />STREETS AND RESTORATION <br />SELECT GRANULAR BORROW (LV) <br />AGGREGATE BASE, CLASS 6 <br />2" 2350 TYPE LV, MIX NO.4 WEARING COURSE <br />2" - 2350 TYPE LV, MIX NO. 3 NON -WEARING COURSE <br />BITUMINOUS MATERIAL FOR TACK COAT <br />SUBTOTAL DIVISION II <br />TOTAL <br />.- <br />N M <br />V LO, (0 <br />.- N kn V (O <br />