Laserfiche WebLink
I) In areas with naturalistic plantings, plant mix and <br />spacing should approximate native plant communities <br />and/or readily succeed to a naturalistic stand. In <br />addition, naturalist plantings should be bordered with <br />a strip of mowed grass or other more "manicured" <br />edge. <br />Landscape Guarantee. All new plants shall be guaranteed <br />for twelve (12) months from the time construction has been <br />completed. All plants shall be alive, of good quality, and <br />disease free at the end of the warranty period or be <br />replaced. Any replacements shall be warranted for twelve <br />(12) months from the time of planting or a letter of credit <br />and/or cash escrow in lieu of a warranty. <br />4. Tree Preservation. <br />a. Tree Preservation for Single Family Custom Graded Lots in a Tree <br />Preservation Subdivision and Commercial, Industrial, Multiple <br />Family Residential, and Institutional Lots. <br />1) Builders shall furnish the following items for tree <br />preservation at the time the building permit application is <br />submitted for all lots with at least one (1) significant tree: <br />a) A tree preservation plan with the elements described <br />below. The individual lot tree preservation plan shall <br />be certified by a forester or landscape architect and <br />signed by the homeowner. <br />b) Financial security in an amount determined by City <br />Council, and adopted by ordinance, shall be required <br />for tree protection requirements for each lot or outlot <br />with at least one (1) significant tree to be saved and <br />each lot that is a custom grading lot. <br />2) Builders shall be liable for their sub -contractors that destroy <br />or damage significant trees that were indicated to be saved <br />on the individual lot tree preservation plan. <br />3) Tree protection measures shall remain in place until all <br />grading and construction activity is terminated. <br />Lino Lakes Zoning Ordinance General Provisions <br />3-40 <br />