Laserfiche WebLink
CHANGE ORDER NO. 1 DATE: November 14, 2003 <br />ENTURY TRAIL LIFT STATION <br />ITY OF LINO LAKES, MINNESOTA <br />COMMISSION NO. 12793-03 <br />ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT QUANTITY PRICE <br />AMOUNT <br />ADD 8' X 8' CONCRETE PAD FOR THE TRANSFORMER <br />1 ACCORDING TO CONNEXUS SPECIFICATIONS <br />MATERIAL LS 1.00 $ 400.00 $ 400.00 <br />LABOR LS 1.00 $ 1,155.00 $ 1,155.00 <br />SUBTOTAL $ 1,555.00 <br />2 MODIFY CONCRETE PAD FOR THE CONTROL PANEL. <br />MAKE PAD 5' X 5' IN LIEU OF 3' X 5' AND REPLACE MESH WITH <br />2A #4 REBAR <br />MATERIAL LS 1.00 $ 30.00 $ 30.00 <br />LABOR LS 1.00 $ 83.00 $ 83.00 <br />SUBTOTAL $ 113.00 <br />2B ADD STEEL ANGLE SUPPORTS WITH BITUMASTIC COATING <br />MATERIAL LS 1.00 $ 385.00 $ 385.00 <br />LABOR LS 1.00 $ 416.00 $ 416.00 <br />SUBTOTAL $ 801.00 <br />• <br />FURNISH AND INSTALL 4 EACH STEEL GUARD POSTS SET IN <br />CONCRETE <br />STEEL MATERIAL INCL. DELIVERY LS 1.00 $ 450.00 $ 450.00 <br />CONCRETE MATERIAL LS 1.00 $ 188.00 $ 188.00 <br />LABOR LS 1.00 $ 1,052.00 $ 1,052.00 <br />SUBTOTAL $ 1,690.00 <br />SUBTOTAL $ 4,159.00 <br />BOND AT 1% $ 42.00 <br />OVERHEAD AND PROFIT AT 15% $ 630.00 <br />TOTAL CHANGE ORDER NO. 1 $ 4,831.00 <br />